CO35 – Engineering Support for Checking Structural Calculations
This Call-Off Order, under the General Service Agreement (GSA), covers the structural design review of the PF-2 Control Room Building, including verification of structural stability, cross-sections, deflections, cracks, and assessment of columns, beams, slabs, ribbed slabs, and foundations.


