Pre-Bid Engineering Support for EPSCC of NWP AGUP-2 Project

Pre-bid engineering support for New Seven (7) Well Pads & Seven (7) Existing Well Pads, Interface with CPF & Pipeline Network. Provide support in preparation of material requisitions (MR), material take-offs (MTO), bill of quantity (BOQ), data sheets (DS), Vendor Data Requisition (VDR), pre-bid engineering, and FEED endorsement.

SIL Verification of Field Instruments – Paraffinic Naphtha Tanks Replacement (ADGAS) Project

Assist ADGAS and Target Engineering Const. Co. (LLC) by performing SIL Verification for the Paraffinic Naphtha Tanks Replacement Project.

Project Management Site Services

Contractor shall provide the required personnel, and personnel management to support TAQA’s project activities as required.

Provision of Engineering Services

To perform Feasibility studies and front-end engineering studies, Detailed design activities including preparation of procurement documentation (invitation to tender packages) and technical bid evaluations, provision of personnel to work within TAQA’s organization, and provision of any other work and Services incidental to the foregoing including ‘as building’ documentation, survey works, minor plant changes, etc.

Provision of Electrical, Instrument & Mechanical Manpower Service

Contractor shall provide the required personnel, and personnel management to support TAQA’s
project activities as required.

Fire Gas Detection – Layout Assessment

The scope of work for this project is limited to:
Assess the robustness and reliability of the mitigation barrier associated with the existing point detector network for the detection/confirmation of a flammable and/or toxic gas release with the existing LOS detection system removed from the Safety Instrumented System (SIS);

Study to evaluate whether the point detected currently provided is adequate. If inadequate, include a pragmatic recommendation to achieve the required barrier robustness;
The study shall be limited to FZ-4 & FZ-9;
The coverage of the detectors considered in the study is manufactured by M/S DECTON.

Detailed Design Study for Sour Gas Incinerator with WHRU

Install a MODIFICATION that includes a Sour Gas Incinerator with associated Waste Heat Recovery Unit (WHRU). This will reduce the visible flare by burning the Gas in the Incinerator. The high temperature exhaust gas from the Incinerator will pass through a WHRU, which shall be integrated into a New Hot Oil System, which is used for on-site process heating requirements.

Block 5A Evacuation Pipeline from Thar Jath to Palouge

HAZOP Study

Provision of Manpower Support

Manpower Support to Hunt Oil Project in Kurdistan.

Framework Agreement for a Project Management Contract

A multi-year framework agreement for the performance of Project Management Contract “PMC” services for EPC Contracts. This scope include the treatment of oil production, gas processing plant and produced water treatment.