Engg Services for the B2 ESP LER

Scope is to undertake the preliminary design for the supply of a new Local Equipment Room (LER) and confirm power generation requirements for new ESP’s in existing B pad wells. Following electrical activities performed during the preliminary design stage:
• Co-ordination with vendors, and COMPANY.
• LER and power system design, control, protection, and operations philosophy
• Design and options review report (IFU).
• Produce LER specification (IFT).
• Produce LER general arrangement (IFD).
• Produce LER layouts (IFD).
• Produce LER & power system SLD’s (IFD).
• Produce power equipment data sheets (IFT) along with all ancillary equipment.
• Produce power system layouts (IFD).
• Produce updated ICSS Architecture Drawing (IFD)
• Various calculations (IFU).