Engineering of Additional LPG Loading Pumps
Engineering and Design of additional LPG loading pumps at the Khor Mor LPG Plant to handle increased capacity from the new KM250A train. The scope includes detailed design, site survey, and integration of new pumps and systems to support 1,600 MT/day loading capacity.



