Flare and Relief Sizing Verification Services

Flare and Relief Sizing Verification Services

Work to be provided comprise the following:
Perform a detailed design verification of the Flare and Relief Systems for the West Qurna I (WQI) Oil Trains 2 and 3 located at Degassing Station 7 (DS7) and Degassing Station 6 (DS6);
Lead the flare and relief sizing verification works;
Integrated Engineering Management Team;
Performing Sizing Calculations
Review of Flare Net Model Network;
Study for Acoustically Induced Vibration (AIV) for PSVs
Flare radiation / dispersion Calculations Excluded for 3rd Party Scope