Gas Cap Management Concept Study
Review the CPF and gathering system infrastructure to determine maximum available system capacity to process additional gas production from the CK-23 GCM well. This includes a PipeSim model to check the adequacy of the gathering system and a Flarenet simulation to check the adequacy of the flare for the additional gas.


