Pre-FEED, FEED, Detailed Design, Engineering and Support Services
CLIENT | G.S.P.S International FZ-LLC |
SCOPE OF WORK | Engineering (GSA) |
PROJECT LOCATION | Dubai, UAE |
DURATION | 24 Months |
START DATE | Jun-22 |
COMPLETION DATE | May-24 |
PROJECT DESCRIPTION | The Services to be provided cover, but are not limited to, the following core activities: Project Management; Documentation Management; Engineering Management; Engineering Calculations and Simulations; Equipment Design and Material Requisitions; Preparation of Fabrication, Construction, Installation, and/or Commissioning Drawings; Preparation of Specifications, Procedures and/or Philosophies; Preparation of an integrated 2D and 3D models; Preparation of As-Builts. |