Provision of Engineering for Pipeline River Crossing on Single Span Bridge Design
This pipeline traverses over the Khabour River via an underwater crossing, at which the original design was to bury the pipeline below the riverbed. During recent inspections, it was found that the pipeline was exposed at the Tawke side of the river crossing, and approximately 15 to 20m length of the pipeline was found to be unsupported.