Design-Review ADCO 51 OGD Wells and IA Compressor Upgrade

Provision of Field Wide Produced Water Project Detailed Engineering

The scope of work outlines the requirements for the detailed design phase of a project involving the disposal of produced water. The design includes facilities at two areas: Pad A, for water from the ST-2 facility, and Pad B for water from the ST-1 facility, with these facilities requiring spumps, filters, chemical injection packages, degassers, and flexible (Soluforce) pipelines. This scope is a full-fledged multidisciplinary Detailed Engineering scope including Process, Piping, Electrical, Instrumentation, Mechanical, and Pipeline deliverables. This also includes Procurement Services, such as preparation of MRs, TBEs, and Vendor Document Review.