SO6 – To perform FEED of Modernization of Beiji EWT Facilities (Stages 2 & 3).
The project will be executed in two construction stages (Stage 2 and Stage 3), with the Stage 2 design incorporating all utilities and supporting infrastructure required for the plant’s complete future modernization. The scope includes modifications to the existing EWT facilities, such as replacement of pumps, installation of new chemical injection systems, upgrades to nitrogen and service air distribution, piping and pipe rack modifications, electrical heat tracing, recycle line tie-ins, instrumentation upgrades, demolition of obsolete equipment and piping, and provision for future Stage 3 water disposal facilities.
The project also includes the design of new process facilities, including fresh water, nitrogen generation, compressed air, dehydration and desalting, hot oil, chemical injection, produced water treatment, crude stripping, power generation, and closed drain systems, together with associated pumps, vessels, heat exchangers, and utilities. In addition, the scope covers installation of a 6-inch water disposal pipeline from the EWT facility to Water Disposal Well BJ-6, including interconnection piping, well hook-up, and provisions for future Stage 3 expansion, delivering a fully integrated process facility ready for subsequent project phases.