Design-Review ADCO 51 OGD Wells and IA Compressor Upgrade

Tanker Loading Station Phase 1B – Detailed Design

Detail design based on HAZOP study conducted by Client for tanker loading expansion to 15,000 BPD, which includes the provision of two (2) loading bays.