Technical Service for WQ2 Yamama Re-Feed Project Gathering System (Package B1 and B2)

Re-FEED for the Yamama Field since the plateau was changed from 650 MBOPD to 350 MBOPD. The scope is limited to B1/B2 package with new well pads and wells along with the tie-in to the pilot wells. This scope include the treatment of oil production, gas processing plant and produced water treatment.