General Engineering Services for Projects in MEDC (2025-2027)

General Engineering Services for Projects in MEDC (2025-2027)

Ongoing
Client
CHINA PETROLEUM ENGINEERING CO, LTD (DUBAI BRANCH)
Scope of Work

GSA

Location
Abu Dhabi and Dubai, UAE
Duration
24 Months
Start Date
2025-05-01
Completion Date
2027-05-01
Description

Provide required Technical Service to support COMPANY for carrying out design engineering, detailed engineering, technical support for procurement activities such as; Material Requisitions (MRs), Technical Bids Evaluations (TBEs) & Vendor Data Requirements (VDRs), as well as support for the project management, planning, control, cost control, document control, construction, and commissioning Work, as required.

Design-Review ADCO 51 OGD Wells and IA Compressor Upgrade

Safety Integrity Level (SIL) Verification and Validation Studies for the Wellpads & LWA on the Tilenga Project.

Ongoing
Client
CB&I UK Limited / SINOPEC
Scope of Work

Safety Study

Location
UK/ / Uganda
Duration
8 Weeks
Start Date
2025-06-01
Completion Date
2025-07-01
Description

The Tilenga Project, being developed by Total E&P Uganda B.V. and its partners, is part of the Lake Albert Development in Uganda. The project comprises multiple well pads, a Central Processing Facility (CPF), flowlines, pipelines, produced water re-injection facilities, operational support infrastructure, lake water abstraction facilities, and a Nile River crossing. The produced crude oil will be transported through the East African Crude Oil Pipeline (EACOP) to the Tanzanian coast.
The scope of this study covers the Safety Integrity Level (SIL) Verification and Validation of the Safety Instrumented Functions (SIFs) identified during the LOPA studies.. The study primarily utilizes Total's GRIF software for SIL Verification and exSILentia for independent SIL Validation, ensuring that the implemented Safety Instrumented Systems (SIS) achieve the required risk reduction in accordance with the project functional safety requirements.

SIF Validation and Verification on Tilenga Project Upstream Facilities (TPUF)

SIF Validation and Verification on Tilenga Project Upstream Facilities (TPUF)

Ongoing
Client
CB&I UK Limited (McDermott) / SINOPEC
Scope of Work

Safety Study

Location
UK/ / Uganda
Duration
6 Months
Start Date
2024-01-01
Completion Date
2024-07-01
Description

The Tilenga Project, being developed by Total E&P Uganda B.V. and its partners, is part of the Lake Albert Development in Uganda. The project comprises multiple well pads, a Central Processing Facility (CPF), flowlines, pipelines, produced water re-injection facilities, operational support infrastructure, lake water abstraction facilities, and a Nile River crossing. The produced crude oil will be transported through the East African Crude Oil Pipeline (EACOP) to the Tanzanian coast.
The scope of this study covers the Safety Integrity Level (SIL) Verification and Validation of the Safety Instrumented Functions (SIFs) identified during the LOPA studies.. The study primarily utilizes Total's GRIF software for SIL Verification and exSILentia for independent SIL Validation, ensuring that the implemented Safety Instrumented Systems (SIS) achieve the required risk reduction in accordance with the project functional safety requirements.

Payroll Services Agreement

Payroll Services Agreement

Ongoing
Client
Amira Group Company
Scope of Work

Payroll

Location
Libya
Duration
36 Months
Start Date
2023-10-01
Completion Date
2026-10-01
Description

The CONTRACTOR takes on the entire payroll process for the COMPANY, including payroll processing, tax administration, report generation, benefits management, insurance provision, leave tracking, and compliance support. This ensures efficient, accurate, and compliant payroll management for the COMPANY.