Clear
Pre-Bid Engineering Support for EPSCC of NWP AGUP-2 Project

Pre-Bid Engineering Support for EPSCC of NWP AGUP-2 Project

Completed
Client
TotalEnergies/Sinopec
Scope of Work

Pre-Bid Engineering Support

Location
Iraq
Duration
6 Months
Start Date
2025-01-01
Completion Date
2025-11-01
Description

Pre-bid engineering support for New Seven (7) Well Pads & Seven (7) Existing Well Pads, Interface with CPF & Pipeline Network. Provide support in preparation of material requisitions (MR), material take-offs (MTO), bill of quantity (BOQ), data sheets (DS), Vendor Data Requisition (VDR), pre-bid engineering, and FEED endorsement.

Engineering Services for Site Survey

SIL Verification of Field Instruments – Paraffinic Naphtha Tanks Replacement (ADGAS) Project

Completed
Client
TARGET ENGINEERING CONST. CO. (LLC)/ADNOC
Scope of Work

Safety Study

Location
UAE
Duration
3 months
Start Date
2016-06-01
Completion Date
2016-09-01
Description

Assist ADGAS and Target Engineering Const. Co. (LLC) by performing SIL Verification for the Paraffinic Naphtha Tanks Replacement Project.

Project Management Site Services

Project Management Site Services

Completed
Client
TAQA Atrush B.V. / HKN Atrush Ltd.
Scope of Work

Site Man-Power

Location
Kurdistan Region of Iraq
Duration
18 Months
Start Date
2023-03-01
Completion Date
2025-08-01
Description

Contractor shall provide the required personnel, and personnel management to support TAQA’s project activities as required.

PROVISION OF ENGINEERING SERVICES

Provision of Engineering Services

Completed
Client
TAQA Atrush B.V.
Scope of Work

GSA

Location
Kurdistan Region of Iraq
Duration
30 Months
Start Date
2019-11-01
Completion Date
2022-05-01
Description

To perform Feasibility studies and front-end engineering studies, Detailed design activities including preparation of procurement documentation (invitation to tender packages) and technical bid evaluations, provision of personnel to work within TAQA’s organization, and provision of any other work and Services incidental to the foregoing including ‘as building’ documentation, survey works, minor plant changes, etc.

Provision of Electrical, Instrument & Mechanical Manpower Service

Provision of Electrical, Instrument & Mechanical Manpower Service

Completed
Client
TAQA Atrush B.V.
Scope of Work

Site Man-Power

Location
Kurdistan Region of Iraq
Duration
12 Months
Start Date
2021-08-01
Completion Date
2022-08-01
Description

Contractor shall provide the required personnel, and personnel management to support TAQA’s
project activities as required.

Fire Gas Detection - Layout Assessment

Fire Gas Detection – Layout Assessment

Completed
Client
TAQA Atrush B.V.
Scope of Work

Safety Study

Location
Kurdistan Region of Iraq
Duration
5 weeks
Start Date
2022-09-01
Completion Date
2023-02-01
Description

The scope of work for this project is limited to:
Assess the robustness and reliability of the mitigation barrier associated with the existing point detector network for the detection/confirmation of a flammable and/or toxic gas release with the existing LOS detection system removed from the Safety Instrumented System (SIS);

Study to evaluate whether the point detected currently provided is adequate. If inadequate, include a pragmatic recommendation to achieve the required barrier robustness;
The study shall be limited to FZ-4 & FZ-9;
The coverage of the detectors considered in the study is manufactured by M/S DECTON.

Detailed Design Study for Sour Gas Incinerator with WHRU

Detailed Design Study for Sour Gas Incinerator with WHRU

Completed
Client
TAQA Atrush B.V.
Scope of Work

Detailed Engineering

Location
Kurdistan Region of Iraq
Duration
5 months
Start Date
2023-02-01
Completion Date
2023-07-01
Description

Install a MODIFICATION that includes a Sour Gas Incinerator with associated Waste Heat Recovery Unit (WHRU). This will reduce the visible flare by burning the Gas in the Incinerator. The high temperature exhaust gas from the Incinerator will pass through a WHRU, which shall be integrated into a New Hot Oil System, which is used for on-site process heating requirements.

Block 5A Evacuation Pipeline from Thar Jath to Palouge

Block 5A Evacuation Pipeline from Thar Jath to Palouge

Completed
Client
Sudd Petroleum Company (SPOC)/ China Petroleum Engineering & Construction Corp. (CPECC)
Scope of Work

Safety Study

Location
South Sudan
Duration
1 month
Start Date
2015-08-01
Completion Date
2015-09-01
Description

HAZOP Study

Provision of Manpower Support

Provision of Manpower Support

Completed
Client
SPEC-Hunt Oil
Scope of Work

O&M

Location
Kurdistan Region of Iraq
Duration
6 months
Start Date
2016-02-01
Completion Date
2016-08-01
Description

Manpower Support to Hunt Oil Project in Kurdistan.

Framework Agreement for a Project Management Contract

Framework Agreement for a Project Management Contract

Completed
Client
SONATRACH
Scope of Work

PMC

Location
Algeria
Duration
60 months (Framework Agreement)
Start Date
2018-11-01
Completion Date
2023-11-01
Description

A multi-year framework agreement for the performance of Project Management Contract "PMC" services for EPC Contracts. This scope include the treatment of oil production, gas processing plant and produced water treatment.

Provision of Engineering Services

Completed
Client
SONANGOL PESQUISA E PRODUu00c7u00c3O IRAQ
Scope of Work

GSA

Location
Iraq
Duration
24 months
Start Date
2019-01-01
Completion Date
2021-01-01
Description

To provide engineering studies, cost estimation and engineering interpretation primarily but not solely aimed at identifying, evaluating, and designing oil and gas surface facilities in Northern Iraq.

Gas Processing Plant-Ghana

Gas Processing Plant-Ghana

Completed
Client
Sinopec /n[SAF Petroleum Investments (FZE)]
Scope of Work

PMC

Location
Ghana
Duration
21 months
Start Date
2013-03-01
Completion Date
2014-12-01
Description

PMC Service for Sinopec Ghana Gas Processing Plant:
2x150MMscfd Gas Processing Plant (GPP);
Offshore Pipeline;
40MW Gas Turbine Power Plant;
Roads, Camps, others.
ExidaSP has provided a team to the Detailed Engineering, Construction, Procurement and Commissioning phase 1 of the Project.