Clear
Engineering Services for Site Survey

Engineering Services for Site Survey

Completed
Client
SICIM/LukOil
Scope of Work

Site As-Built

Location
Iraq
Duration
1 Month
Start Date
2024-03-01
Completion Date
2024-04-01
Description

Site and Facilities Verification for EPC for Gas Sweetening Unit Modification, Nitrogen Package and Raw Gas Compression & Dehydration Facilities at the West Qurna (Phase 2) Contract Area.

Provision of Engineering and Design Services for the Block 9 Field

Provision of Engineering and Design Services for Block 9

Completed
Client
RN-Zawita Pte. Ltd.
Scope of Work

GSA

Location
Kurdistan Region of Iraq
Duration
36 Months
Start Date
2023-02-01
Completion Date
2026-02-01
Description

Concept, FEED and Detailed Engineering for Block 9 Oil and Gas Field.
The Services to be provided under the Contract may include, but not be limited to:
Feasibility studies and frontend engineering studies for the process facility;
Detailed design activities for the process facility, offsite, pipeline, and OHL, and that includes preparation of procurement documentation (invitation to tender packages) and technical bid evaluations. This scope include the treatment of oil production, gas processing plant and produced water treatment.

SO7- To perform Engineering and Design for Re-Construction of Entry Check Point of EWT.

Completed
Client
RN-Harir -Bejil Pte. Ltd
Scope of Work

TBA

Location
Kurdistan Region of Iraq
Duration
4 Months
Start Date
2022-12-01
Completion Date
2023-04-01
Description

The project scope includes reconstruction and modernization of the Vehicle Inspection and Entry Check Point areas. The works include development of a three-lane vehicle inspection area (heavy vehicle entry, light vehicle entry, and common exit lane) with required road signs, barriers, inspection platforms, drop-arm barriers, sunshades, T-walls, jersey barriers, and concrete paving. The scope also covers construction of a new Badge Office, foundations and utilities for a COMPANY-provided Secondary Check Point container, water supply connections, septic tank facilities, technical security systems (IPVS and ACS), and modernization of the entrance inspection facilities.

Additional works include construction of asphalt roads and internal driveways, site grading, installation of fiber optic and power cable routes, provision of associated termination equipment (ODF, switches, EDB, etc.), and foundations for all Entry Check Point facilities. The project will deliver a fully functional and upgraded access control and vehicle inspection facility meeting operational and security requirements.

SO6 – To perform FEED of Modernization of Beiji EWT Facilities (Stages 2 & 3).

Completed
Client
RN-Harir -Bejil Pte. Ltd
Scope of Work

TBA

Location
Kurdistan Region of Iraq
Duration
9 Months
Start Date
2022-05-01
Completion Date
2023-02-01
Description

The project will be executed in two construction stages (Stage 2 and Stage 3), with the Stage 2 design incorporating all utilities and supporting infrastructure required for the plant's complete future modernization. The scope includes modifications to the existing EWT facilities, such as replacement of pumps, installation of new chemical injection systems, upgrades to nitrogen and service air distribution, piping and pipe rack modifications, electrical heat tracing, recycle line tie-ins, instrumentation upgrades, demolition of obsolete equipment and piping, and provision for future Stage 3 water disposal facilities.

The project also includes the design of new process facilities, including fresh water, nitrogen generation, compressed air, dehydration and desalting, hot oil, chemical injection, produced water treatment, crude stripping, power generation, and closed drain systems, together with associated pumps, vessels, heat exchangers, and utilities. In addition, the scope covers installation of a 6-inch water disposal pipeline from the EWT facility to Water Disposal Well BJ-6, including interconnection piping, well hook-up, and provisions for future Stage 3 expansion, delivering a fully integrated process facility ready for subsequent project phases.

SO5 – To perform FEED of Bejil 2A Wellhead Facilities and Associated Gathering System Pipeline to EWT.

Completed
Client
RN-Harir -Bejil Pte. Ltd
Scope of Work

TBA

Location
Kurdistan Region of Iraq
Duration
4 Months
Start Date
2022-01-01
Completion Date
2022-05-01
Description

We will provide Front-End Engineering Design (FEED) services in accordance with the Scope of Work, COMPANY specifications, applicable international standards, and engineering best practices. Our services include reviewing available project information, identifying data gaps, conducting topographical surveys and site verification, and developing a complete FEED package that supports detailed engineering without further major optimization. The scope also includes engineering studies such as trunkline routing evaluation, hydraulic and surge analyses, line sizing verification, constructability assessments, and preparation of a Trunkline Routing Selection Report for COMPANY approval.

The FEED will cover all required engineering disciplines, including process, mechanical, piping, pipeline, civil, structural, electrical, instrumentation, controls, and ICSS, for Well Pad BJ-2A, the gathering pipeline to the EWT facility, and future tie-ins for Well Pads BJ-13 and BJ-14. Deliverables will include engineering drawings, design philosophies, layouts, material specifications, MTOs, Class 3 cost estimates, project schedules, procurement and commissioning documentation, interface management, and technical support for procurement activities, providing a comprehensive engineering package for subsequent EPC execution.

SO4 – To perform Engineering and Design for Construction of Roads for the Wellpad Mirawa 1.

Completed
Client
RN-Harir -Bejil Pte. Ltd
Scope of Work

TBA

Location
Kurdistan Region of Iraq
Duration
2 months
Start Date
2021-10-01
Completion Date
2021-12-01
Description

The project involves upgrading the existing road network serving WP MIRAWA-1 by reconstructing 1,150 m of existing gravel road (Road 2) and 2,300 m of field road (Road 4) into asphalt roads. The scope also includes a feasibility study for a bypass around the village at the junction of Roads 3 and 4, as well as assessment and reinstatement of existing asphalt Roads 1 and 3 while maintaining their current road type and width.

The Design and Engineering (D&E) scope includes site visits, topographical and geotechnical surveys to establish the optimum road alignment and pavement design, and preparation of survey specifications. Deliverables include road cross-sections, culvert and crossing details, pavement thickness calculations, road alignment drawings, road markings and signage, crash barrier details, construction schedule, cost estimate, bill of quantities (BOQ), and the construction scope of work.

SO3 – To perform FEED of IT and Telecom Infrastructure.

Completed
Client
RN-Harir -Bejil Pte. Ltd
Scope of Work

TBA

Location
Kurdistan Region of Iraq
Duration
4 Months
Start Date
2021-07-01
Completion Date
2021-11-01
Description

TBA

SO2 – To perform Engineering and Design for Re-Construction of Existing and Construction of New Roads for the Well Pads Mirawa 1 & Mirawa 2.

Completed
Client
RN-Harir -Bejil Pte. Ltd
Scope of Work

TBA

Location
Kurdistan Region of Iraq
Duration
2 months
Start Date
2021-06-01
Completion Date
2021-08-01
Description

The project involves improving access to well pads WP MIRAWA-1 and WP MIRAWA-2 by constructing a new 2,905 m interconnecting road and upgrading the existing access roads to WP MIRAWA-2. The proposed works include reconstruction of 3,015 m of asphalt road and 3,270 m of gravel road to provide reliable access between the well pads and the existing main roads.

The Design and Engineering (D&E) scope includes site assessments, topographical and geotechnical surveys to determine the optimum road alignment and pavement design, preparation of survey specifications, road layouts, typical details, and section drawings, as well as development of the complete construction documentation and construction scope of work.

SO1 – To perform FEED of Modernization of Beiji EWT Facilities (Stage 1) and Well BJ-11 Hookup to the Existing Infrastructure.

Completed
Client
RN-Harir -Bejil Pte. Ltd
Scope of Work

TBA

Location
Kurdistan Region of Iraq
Duration
03 Months
Start Date
2021-04-01
Completion Date
2021-07-01
Description

The project scope includes several process facility modifications to the existing plant, including the hookup of the new BJ-11 well to the existing infrastructure with associated wellhead control systems, future metering and chemical injection provisions, and fire and gas systems. Additional upgrades include replacement of the existing Gas Equalization System (GES) piping and blow cases, installation of interconnecting piping for flexible storage tank operation, and provision of new sampling devices to improve oil and water quality monitoring.

The scope also includes construction of stormwater and industrial wastewater drainage systems, installation of a stationary oil off-loading facility for road tankers, vacuum trucks, and barrels/IBCs, and provision of fresh water supply points for flushing and salt deposition prevention. Existing facility utilities, including nitrogen, instrument air, and power, will support the new equipment, while a UPS with two-hour battery backup will provide emergency power for the Wellhead Control Panel.

Provision of Engineering and Design Services for the Block 11 Field Development Projects

Provision of Engineering and Design Services for the Block 11 Field Development Projects

Completed
Client
RN-Harir -Bejil Pte. Ltd
Scope of Work

GSA

Location
Kurdistan Region of Iraq
Duration
36 Months
Start Date
2021-02-01
Completion Date
2024-02-01
Description

Concept, FEED and Detailed Engineering for Block 11 Field.
The Services to be provided under the Contract may include, but not be limited to:
Feasibility studies and frontend engineering studies for the process facility;
Detailed design activities for the process facility, offsite, pipeline, and OHL, and that includes preparation of procurement documentation (invitation to tender packages) and technical bid evaluations;
Conducted Flow Assurance Study for Bejil Field Soluforce Production Trunkline;
Conducted Flow Assurance Study for Soluforce Water Disposal System.
This scope includes the leased EPF early production facility of 10,000 BBL per day and the upgrade of existing treatment of oil production, gas processing plant and produced water treatment.

Provision of Engineering and Design Services for the Block 8 Field

Provision of Engineering and Design Services for Block 8

Completed
Client
RN-Batil Pte. Ltd.
Scope of Work

GSA

Location
Kurdistan Region of Iraq
Duration
36 Months
Start Date
2023-02-01
Completion Date
2026-02-01
Description

Concept, FEED and Detailed Engineering for Block 8 Oil and Gas Field.
The Services to be provided under the Contract may include, but not be limited to:
Feasibility studies and frontend engineering studies for the process facility;
Detailed design activities for the process facility, offsite, pipeline, and OHL, and that includes preparation of procurement documentation (invitation to tender packages) and technical bid evaluations. This scope include the treatment of oil production, gas processing plant and produced water treatment.

Provision of Engineering, Procurement, Construction and Commissioning (EPCC) of Garraf Central Control Building (GCCB)

Provision of Engineering, Procurement, Construction and Commissioning (EPCC) of Garraf Central Control Building (GCCB)

Completed
Client
Petronas Carigali Iraq Holding B.V. (PCIHBV) / nAl-Tafaweq Co. (ATCO)
Scope of Work

Detailed Engineering

Location
Iraq
Duration
18 months
Start Date
2017-09-01
Completion Date
2019-03-01
Description

Detailed engineering, architecture, and commissioning support for the complete GCCB, including Architecture, civil/structure, Honeywell control systems, Telecommunication, phone/LAN systems, and complete Electro/mechanical design.

1 2 3 4 … 16