Clear
Engineering Study for Rectification of Electrical Defects at KPS0 Station

Engineering Study for Rectification of Electrical Defects at KPS0 Station

Completed
Client
Kurdistan Pipeline Company Pte Ltd (KPC)
Scope of Work

Detailed Engineering

Location
Kurdistan Region of Iraq
Duration
16 Weeks
Start Date
2022-01-01
Completion Date
2022-05-01
Description

Engineering study for rectifications works on defective electrical equipment, material, components, and instruments. The works include investigation, engineering study, design and engineering documentation and drawings for the systems.

Engineering for Rectification of 36 Electrical Category 1 Defects

Engineering for Rectification of 36 Electrical Category 1 Defects

Completed
Client
Kurdistan Pipeline Company Pte Ltd (KPC)
Scope of Work

Detailed Engineering

Location
Kurdistan Region of Iraq
Duration
4 Months
Start Date
2020-12-01
Completion Date
2021-03-01
Description

To perform Engineering Design calculations for the repairs and rectification of 36 Electrical Category 1 Defects.
To produce Engineering Design calculations, Bill of Quantities, Specifications, Detailed Engineering Drawings for Defects located within Battery Limit of Stations and identify the gap between the design parameters against the operating requirements of the equipment / item / system.
The scope also includes conducting site survey, investigation and obtaining all historical as well as present operations data of the equipment / item / system.

Nasiriyah & Gharaff Flare Gas Treatment Project – Iraq

Detail Design of Permanent Power Supply through Overhead Line (KPS2 to RETM) and Establishment of New Substation in RETM

Completed
Client
Kurdistan Pipeline Company Pte Ltd (KPC)
Scope of Work

Detailed Engineering

Location
Kurdistan Region of Iraq
Duration
5 Months
Start Date
2023-11-01
Completion Date
2024-06-01
Description

Conduct OHTL engineering, covering but not limited to:
11kV OHL Design, 16 km, between KPS2 and RETM;
11 kV Integrated Substation at RETM ;
Electrical Cabling between the OHL and the Integrated New Substation.

Detail Design Engineering of RETM-KRS2 Pipeline

Detail Design Engineering of RETM-KRS2 Pipeline

Completed
Client
Kurdistan Pipeline Company Pte Ltd (KPC)
Scope of Work

Detailed Engineering

Location
Kurdistan Region of Iraq
Duration
9 Months
Start Date
2023-07-01
Completion Date
2024-04-01
Description

The Services to be provided under the Contract may include, but not be limited to:
Project management;
Detailed Engineering for the 24 inch, 16 Km Pipeline between RETM & KRS2;
Conduct Geo and Topo Survey;
Upgrade the RTU/SCADA Systems;
Carried out Flow Assurance Study to ensure stable oil transport between RETM & KRS2;
Preparation of the PC Scope of Work;
Preparation of the PC Cost Estimate;
Preparation of the PC Schedule;
Preparation of the Project Dossier.

Provision of Project Support Services for West Qurna 2

Provision of Project Support Services for West Qurna 2

Completed
Client
Kentz Overseas Company W.L.L.n(A Member of SNC-Lavalin Group)
Scope of Work

Engineering Manpower

Location
Iraq
Duration
36 months
Start Date
2018-09-01
Completion Date
2021-09-01
Description

To provide manpower services for the Provision of Project Support Services for West Qurna 2 in the Republic of Iraq.

HAZOP Support for Avantgardre project

Provision of Leased Oil Train (LOT), Garraf, Iraq Provision of O&M Services (Garraf Project)

Completed
Client
Italfluid Geoenergy SRL
Scope of Work

O&M

Location
Iraq
Duration
12 Months
Start Date
2020-02-01
Completion Date
2022-01-01
Description

To provide Operation & Maintenance (O&M) Services for Petronas Carigali Iraq Holding B.V. on behalf of Italfluid.

Provision of Leased Oil Train (LOT), Garraf, Iraq Design, Supply and Configuration of DCS & Integrated Safety System

Provision of Leased Oil Train (LOT), Garraf, Iraq Design, Supply and Configuration of DCS & Integrated Safety System

Completed
Client
Italfluid Geoenergy SRL
Scope of Work

Detailed Engineering

Location
Iraq
Duration
8 Months
Start Date
2019-05-01
Completion Date
2020-01-01
Description

Provision of Design, Supply and Configuration of DCS & Integrated Safety System for Leased Oil Train, Petronas, Iraq.

Secondment Agreement – Process Engineer

Provision of Leased Oil Train (LOT), Garraf, Iraq Consultancy Agreement for Site Works

Completed
Client
Italfluid Geoenergy SRL
Scope of Work

Site Supervision

Location
Iraq
Duration
18 Months
Start Date
2019-08-01
Completion Date
2021-02-01
Description

Provision of Site/Construction Supervision for Petronas Carigali Iraq Holding B.V. on behalf of Italfluid.

HAZOP, IPF & HAZID Studies

Provision of Leased Oil Train (LOT), Garraf, Iraq

Completed
Client
Italfluid Geoenergy SRL
Scope of Work

Detailed Engineering

Location
Iraq
Duration
20 Months
Start Date
2019-02-01
Completion Date
2020-10-01
Description

Engineering design works for 30,000 BBL per day including but not limited to the detailed Engineering design, record drawings and documentation.

HAZOP, IPF & HAZID Studies

HAZOP, IPF & HAZID Studies

Completed
Client
Italfluid Geoenergy SRL
Scope of Work

Safety Study

Location
Iraq
Duration
2-4 weeks
Start Date
2019-05-01
Completion Date
2019-06-01
Description

Provision of HAZOP, IPF & HAZID Studies for the Provision of Leased Oil Train Including Operations and Maintenance for Petronas Carigali Iraq Holding B.V (PCIHBV).

General Engineering Services for Projects in MEDC (2025-2027)

Engineering Concept Study & Class-5 Cost Estimate

Completed
Client
Confidential
Scope of Work

Concept Design

Location
Iraq
Duration
14 Days
Start Date
2025-12-01
Completion Date
2025-12-01
Description

This project involves the development of a greenfield oil and gas production facility concept to support future field development and production operations. The scope includes establishing the design basis, developing early-stage engineering deliverables, and preparing both equipment factored cost estimates and an AACE Class 5 cost estimate using Questor to support technical and commercial decision-making. Engineering activities cover process definition, conceptual facility configuration, major equipment identification, pipeline routing and sizing, utilities assessment, and infrastructure planning aligned with production and export requirements. The study will also define key operating philosophies, environmental considerations, and project assumptions to guide future FEED and detailed engineering stages. Deliverables include concept engineering documents, equipment and Questor-based cost models, assumptions registers, and executive presentation materials to support stakeholder reviews and project governance.

Turnaround (TA) – Optimzation Scope Sarsang

Completed
Client
HKN Energy Ltd
Scope of Work

Detailed Engineering

Location
Kurdistan Region of Iraq
Duration
2 months
Start Date
2025-01-01
Completion Date
2025-03-01
Description

Scope covers converting all their existing E3D models to Plant3D
- 5 x pipe specs to be created for Plant 3D, Sarsang Pipe Spec (01C3N, 03C3N, 06C3N) and Atrush Pipe Spec (A15DS, A30DS).
- Remodelling of the existing design using Plant 3D (Using a NAVISWORK model forreference). Hours based on 100 isometrics

1 2 3 4 5 6 … 16