Clear
Provision of Engineering, Fabrication, Installation, Execution and Commissioning of Well Tie-Ins and Other Construction Services for Petronas Carigali Iraq Holding B.V. Garraf Operations

Provision of Engineering, Fabrication, Installation, Execution and Commissioning of Well Tie-Ins and Other Construction Services for Petronas Carigali Iraq Holding B.V. Garraf Operations

Completed
Client
Petronas Carigali Iraq Holding B.V. (PCIHBV) / nAl-Tafaweq Co. (ATCO)
Scope of Work

Detailed Engineering

Location
Iraq
Duration
24 months [with one (1) year extension]
Start Date
2017-03-01
Completion Date
2019-03-01
Description

Detailed engineering and commissioning support for different well pads Tie-in.

Provision to Perform Process Safety Information (PSI) Needs Analysis

Provision to Perform Process Safety Information (PSI) Needs Analysis

Completed
Client
Petronas Carigali Iraq Holding B.V. (PCIHBV)
Scope of Work

Safety Study

Location
Iraq
Duration
4 months
Start Date
2017-01-01
Completion Date
2017-05-01
Description

To deliver the complete Process Safety Information (PSI) Needs Analysis Report including but not limited to:
Process Safety Information (PSI) Needs Analysis Report;
Presentation material outlining the salient point of the report;
Native simulation files.

Provision to Perform Plant Safe Operating Limits Gap Analysis and Produce the Latest Revision of Safe Operating Limit Documents

Provision to Perform Plant Safe Operating Limits Gap Analysis and Produce the Latest Revision of Safe Operating Limit Documents

Completed
Client
Petronas Carigali Iraq Holding B.V. (PCIHBV)
Scope of Work

Safety Study

Location
Iraq
Duration
5 months
Start Date
2017-07-01
Completion Date
2017-12-01
Description

Perform the First Commercial Production (FCP) and Offsite Facility Safe Operating Limit (SOL) latest revision through the following process:
Perform SOL Needs Assessment and Identify SOL Gap Analysis;
Establish SOL Mapping Exercise;
Prioritization of SOL documents and Gap Closure;
Creating and Updating of SOL Documents to the latest revision.

Project Management Services Agreement

Project Management Services Agreement

Completed
Client
PETROLINVEST
Scope of Work

PMT

Location
Iraq
Duration
18 months
Start Date
2014-05-01
Completion Date
2015-11-01
Description

High Priority Surveys for Common Seawater Supply Project (SOC)
Provided Project Management Services and related deliverables for High Priority Surveys which includes managing the subcontractors for Unexploded Ordnance (UXO) Survey, Topographical Survey, Geotechnical / Geophysical Survey, Bathymetric Survey, MetOcean Survey and Water Quality Sampling.
To manage contractual matters between Petrolinvest and subcontractors.

Provision of Project Management Consultancy (PMC) Services for CPF3 and Associated Facilities

Provision of Project Management Consultancy (PMC) Services for CPF3 and Associated Facilities

Completed
Client
PETROCHINA/MOC
Scope of Work

PMC

Location
Iraq
Duration
36 months
Start Date
2015-04-01
Completion Date
2018-04-01
Description

Halfaya Oil Field CPF3 Expansion 200k BOPD to 400k BOPD.
Carry out the PMC for PetroChina Halfaya CPF3 Iraq:
Oil and Gas Train Units;
Gas Compression Systems;
Gathering Facilities (GRS); and
Roads, Camps, others.
Improvement to the Gas Turbine Power Plant
Completion and Commissioning of Gas Lift Compression Plant.
Provision of all site procedures, HSE, QA/QC, etc. and PMC Team for Project, Engineering & Construction Management of the Project Execution Phase.

Provision of Project Management Consultancy (PMC) for Sustained Production and Related Facilities

Provision of Project Management Consultancy (PMC) for Sustained Production and Related Facilities

Completed
Client
PETROCHINA/MOC
Scope of Work

PMC

Location
Iraq
Duration
24 months
Start Date
2016-08-01
Completion Date
2018-08-01
Description

Reservoir, Source Water Plant 1 (SWP1) Expansion and Water Supply Pipeline (WSP).
To sustain the production of CPF1 and CPF2 in 2016, tie-in of new wells and existing well including the related facilities located in well pads by gathering crude oil and gas from the oil wells, transport through flow lines and/or trunk lines to CPF1/CPF2 is required.
Oil and Gas Gathering System, Pilot Test of Gas Lifting, Gas Lifting System, Water Injection System, Water Supply, Drain and Fire Fighting System, Power Supply System, Improvement to the Gas Turbine Power Plant, Instrumentation and Control System, Telecommunication System, Civil Works, Roads etc.

Provision of Project Management Consultancy (PMC) for Halfaya Oil Field Surface Facility Phase II

Provision of Project Management Consultancy (PMC) for Halfaya Oil Field Surface Facility Phase II

Completed
Client
PETROCHINA/MOC
Scope of Work

PMC

Location
Iraq
Duration
31 months
Start Date
2012-09-01
Completion Date
2015-04-01
Description

Halfaya Oil Field Phase 2 Expansion
100k BOPD to 200k BOPD
Carry out the PMC for PetroChina Halfaya Phase 2-Iraq:
Oil and Gas Train Units;
Gas Compression Systems;
Lift Compression Systems
150MMscfd Gas Receiving Station (GRS);
3x10MW Gas Turbine Power Plant;
Roads, Camps, others.
Provision of all site procedures, HSE, QA/QC, etc. and PMC Team for Project, Engineering & Construction Management of the Project Execution Phase.

HAZOP and or HAZID and SIL Study

HAZOP and or HAZID and SIL Study

Completed
Client
PETROCHINA/MOC
Scope of Work

Safety Study

Location
Iraq
Duration
1 month
Start Date
2012-04-01
Completion Date
2012-05-01
Description

Carry out the HAZOP and HAZID Study for Halfaya Phase 1 Oil and Gas Facility.

Supporting OiLSERV on Various Projects

Supporting OiLSERV on Various Projects

Completed
Client
OILSERV
Scope of Work

Detailed Engineering

Location
Kurdistan Region of Iraq
Duration
Not Defined
Start Date
2014-12-01
Completion Date
2022-12-01
Description

Engineering Support for different Projects for DNO, HUNT OIL, TAQA, GAS PLUS, CHEVRON and EXXON. The scope includes design, pre-commissioning of different capacity of EPF facilities.

Safety Study of Anokyi Mainline Compressor Station (AMCS) Phase II EPCC Project

Safety Study of Anokyi Mainline Compressor Station (AMCS) Phase II EPCC Project

Completed
Client
Meridien Logistic and Engineering (MLE) For behalf of Ghana National Gas Company
Scope of Work

Safety Study

Location
Ghana
Duration
6 Months
Start Date
2021-05-01
Completion Date
2021-10-01
Description

To conduct the following study for the Anokyi Mainline Compressor Station (AMCS) Phase II EPCC Project of Meridian Logistic and Engineering (MLE) on behalf of Ghana National Gas Company:
SIMOPS study;
HAZOP study;
SIL (LOPA) study;
FERA; and
QRA study.

On-Site Translation and Interpretation Support for the West Qurna (Phase 2) Project

On-Site Translation and Interpretation Support for the West Qurna (Phase 2) Project

Completed
Client
LUKOIL
Scope of Work

Manpower

Location
Iraq
Duration
48 months
Start Date
2018-11-01
Completion Date
2022-11-01
Description

To provide manpower for On-Site Translation and Interpretation Support in connection with exploration, appraisal, development, and production of the West Qurna (Phase 2) Contract Area.

FEED Design of Fire Suppression System

FEED Design of Fire Suppression System

Completed
Client
Kurdistan Pipeline Company Pte Ltd (KPC)
Scope of Work

FEED

Location
Kurdistan Region of Iraq
Duration
32 Weeks
Start Date
2022-02-01
Completion Date
2022-09-01
Description

FEED for Fire Suppression System at three main stations of KPS1, KPS2 and RETM.