Clear

TAR Construction Work Packs Preparation

Completed
Client
HKN Energy Ltd
Scope of Work

Engineering Manpower

Location
Kurdistan Region of Iraq
Duration
1 month
Start Date
2025-03-01
Completion Date
2025-04-01
Description

Provide one (1) Senior Piping Engineer (Steve Cooke) to prepare a total of nine (9) construction work packs associated with Company's 2025 Turnaround Optimization Project

Tanker Loading Engineering Detailed Design

Completed
Client
HKN Energy Ltd
Scope of Work

Detailed Engineering

Location
Kurdistan Region of Iraq
Duration
2 Months
Start Date
2024-10-01
Completion Date
2024-12-01
Description

A Tanker Loading Station (TLS) is proposed as a fast-track project to enhance export flexibility in the Atrush field, addressing the current limitation of pipeline-only exports. The TLS will facilitate crude oil loadout for transportation to regional refineries via road. The project involves relocating an existing two-bay loading station to Terrace 4 within the Atrush CPF facility, aiming for completion within 60 days of award. Construction will occur in two phases: Phase One will provide approximately 15,000 barrels of oil per day (bopd) using existing equipment, while Phase Two will expand capacity to approximately 45,000 bopd by adding three additional twin-arm loading stations. The scope includes validating the Phase 1 engineering proposal and managing associated risks.
Conducted Flow Assurance Study for the Soluforce Crude Oil Loading System.

Different Projects

Supply of PSV & Globe Control Valve

Completed
Client
HKN Energy Ltd
Scope of Work

Procurement

Location
Kurdistan Region of Iraq
Duration
3.5 Months
Start Date
2026-03-01
Completion Date
2026-06-01
Description

Supply of PSV & Globe Control Valve

Confidential 2

Supply of Hydrocyclone Vessel Spares

Completed
Client
HKN Energy Ltd
Scope of Work

Procurement

Location
Kurdistan Region of Iraq
Duration
1 month
Start Date
2026-01-01
Completion Date
2026-02-01
Description

Supplying a deoiling hydrocyclone vessel spares to Sarsang field for oil-water separation of produced water.

Detailed Design for Business Continuity - Gas In, Gas Out

Supply of Deoiling Hydrocyclone Vessel – ST-B1

Completed
Client
HKN Energy Ltd
Scope of Work

Procurement

Location
Kurdistan Region of Iraq
Duration
2 Weeks
Start Date
2025-11-01
Completion Date
2025-11-01
Description

Supplying a deoiling hydrocyclone vessel to Sarsang field for oil-water separation of produced water.

Engineering for Rectification of 36 Electrical Category 1 Defects

Supply of Blanketing Valve & Accessories

Completed
Client
HKN Energy Ltd
Scope of Work

Procurement

Location
Kurdistan Region of Iraq
Duration
3 Weeks
Start Date
2025-09-01
Completion Date
2025-09-01
Description

Procurement service

ST-B1 Filter Skid Detailed Design Engineering

Completed
Client
HKN Energy Ltd
Scope of Work

Detailed Engineering

Location
Kurdistan Region of Iraq
Duration
1 month
Start Date
2025-03-01
Completion Date
2025-04-01
Description

Support Company by providing detailed design engineering services associated with filter skid package

Engineering Study for Rectification of Electrical Defects at KPS0 Station

ST-B1 Filter Skid Detailed Design Engineering

Completed
Client
HKN Energy Ltd
Scope of Work

Detailed Engineering

Location
Kurdistan Region of Iraq
Duration
1 month
Start Date
2025-03-01
Completion Date
2025-04-01
Description

Provide qualified resources to support Company by providing detailed design engineering services associated with filter skid package

ST-2 Tank Remediation – Piping Work Pack

Completed
Client
HKN Energy Ltd
Scope of Work

Stress Analysis

Location
Kurdistan Region of Iraq
Duration
2 months
Start Date
2025-08-01
Completion Date
2025-10-01
Description

Provide piping stress analysis services for the ST-2 system in support of Company’s project to re-route oil and water via two (2) straight pipes of considerable length to a nearby off-spec tank

Afungi Pioneer Camp EPC

Sarsang B1 ETAP Model & Power Studies

Completed
Client
HKN Energy Ltd
Scope of Work

Study

Location
Kurdistan Region of Iraq
Duration
4 Months
Start Date
2025-10-01
Completion Date
2026-02-01
Description

Update ETAP model and conduct Power System Studies to verify system adequacy, identify limitations, and recommend improvements for safe and reliable operation under current and future scenarios

Design-Review ADCO 51 OGD Wells and IA Compressor Upgrade 2

Provision of Sarsang P&IDs As-Building

Completed
Client
HKN Energy Ltd
Scope of Work

Site Verification

Location
Kurdistan Region of Iraq
Duration
12 days
Start Date
2025-12-01
Completion Date
2025-12-01
Description

Phase 1 – Site verification to redline mark-up existing Sarsang PAD B P&IDs

Design-Review ADCO 51 OGD Wells and IA Compressor Upgrade

Provision of Field Wide Produced Water Project Detailed Engineering

Completed
Client
HKN Energy Ltd
Scope of Work

Detailed Engineering

Location
Kurdistan Region of Iraq
Duration
7 Months + 6 Months (extended)
Start Date
2024-11-01
Completion Date
2025-12-01
Description

The scope of work outlines the requirements for the detailed design phase of a project involving the disposal of produced water. The design includes facilities at two areas: Pad A, for water from the ST-2 facility, and Pad B for water from the ST-1 facility, with these facilities requiring spumps, filters, chemical injection packages, degassers, and flexible (Soluforce) pipelines. This scope is a full-fledged multidisciplinary Detailed Engineering scope including Process, Piping, Electrical, Instrumentation, Mechanical, and Pipeline deliverables. This also includes Procurement Services, such as preparation of MRs, TBEs, and Vendor Document Review.