
Supply of TLS-2 Field Instruments
Procurement
Procurement service

Supply of Choke Valve
Procurement
Procurement service

Supply of TLS Valve Spares
Procurement
Procurement service

Lightning Protection Materials
Procurement
Procurement service

HAZOP Workshop
Safety Study
Hosting a HAZOP safety workshop through the utilization of a third-party workshop Chairman and Scribe for the Atrush existing EPF.

Gas Cap Management Concept Study
Study
Review the CPF and gathering system infrastructure to determine maximum available system capacity to process additional gas production from the CK-23 GCM well. This includes a PipeSim model to check the adequacy of the gathering system and a Flarenet simulation to check the adequacy of the flare for the additional gas.

Electrical & Instrumentation Works
Manpower
Additional work and punch clearing activities

Earthing and Lightning Protection
Study
Provide a program to review, inspect, evaluate, test, and advise on modications and or upgrades for earthing & lightning protection systems within speci??c areas at the Atrush Field to identify and mitigate areas with high earthing resistance, which have compromised system performance and safety during lightning events.

CPF1 Tanker Loading Engineering Detailed Design – Phase 1
Detailed Engineering
Detail engineering design support for tanker loading expansion to 15,000 BPD, which includes the provision of two (2) loading bays.

Additional Oil Booster Pump Detailed Engineering
Detailed Design
Detailed Engineering design and documentation for integrating the 3rd Booster Pump into the existing system.

Provision Of Engineering Call-Off Services for Phases 1B, 1C and 1D
GSA
Provision of Engineering support on an ad-hoc Call Off basis in developing the Shaikan Field in Northern Kurdistan. This scope include the treatment of oil production, gas processing plant and produced water treatment. Concept of 5,000 BBL per day capacity of EPF was executed as a part of this GSA.

CO9 – Ad-Hoc Engineering Activities
null
cancelled
