Supply of TLS-2 Field Instruments

Completed
Client
HKN Atrush Ltd.
Scope of Work

Procurement

Location
Kurdistan Region of Iraq
Duration
2 Months
Start Date
2026-01-01
Completion Date
2026-03-01
Description

Procurement service

Supply of Choke Valve

Completed
Client
HKN Atrush Ltd.
Scope of Work

Procurement

Location
Kurdistan Region of Iraq
Duration
5 months
Start Date
2026-02-01
Completion Date
2026-07-01
Description

Procurement service

Supply of TLS Valve Spares

Completed
Client
HKN Atrush Ltd.
Scope of Work

Procurement

Location
Kurdistan Region of Iraq
Duration
1 month
Start Date
2026-02-01
Completion Date
2026-03-01
Description

Procurement service

Lightning Protection Materials

Completed
Client
HKN Atrush Ltd.
Scope of Work

Procurement

Location
Kurdistan Region of Iraq
Duration
1 month
Start Date
2026-02-01
Completion Date
2026-03-01
Description

Procurement service

HAZOP Workshop

Completed
Client
HKN Atrush Ltd.
Scope of Work

Safety Study

Location
Kurdistan Region of Iraq
Duration
2 weeks
Start Date
2024-12-01
Completion Date
2024-12-01
Description

Hosting a HAZOP safety workshop through the utilization of a third-party workshop Chairman and Scribe for the Atrush existing EPF.

HAZOP, IPF & HAZID Studies

Gas Cap Management Concept Study

Completed
Client
HKN Atrush Ltd.
Scope of Work

Study

Location
Kurdistan Region of Iraq
Duration
3 Months
Start Date
2025-09-01
Completion Date
2025-12-01
Description

Review the CPF and gathering system infrastructure to determine maximum available system capacity to process additional gas production from the CK-23 GCM well. This includes a PipeSim model to check the adequacy of the gathering system and a Flarenet simulation to check the adequacy of the flare for the additional gas.

Electrical & Instrumentation Works

Completed
Client
HKN Atrush Ltd.
Scope of Work

Manpower

Location
Kurdistan Region of Iraq
Duration
1 week
Start Date
2024-12-01
Completion Date
2024-12-01
Description

Additional work and punch clearing activities

Design-Review ADCO 51 OGD Wells and IA Compressor Upgrade

Earthing and Lightning Protection

Completed
Client
HKN Atrush Ltd.
Scope of Work

Study

Location
Kurdistan Region of Iraq
Duration
6 Months
Start Date
2025-09-01
Completion Date
2026-03-01
Description

Provide a program to review, inspect, evaluate, test, and advise on modications and or upgrades for earthing & lightning protection systems within speci??c areas at the Atrush Field to identify and mitigate areas with high earthing resistance, which have compromised system performance and safety during lightning events.

CPF1 Tanker Loading Engineering Detailed Design – Phase 1

Completed
Client
HKN Atrush Ltd.
Scope of Work

Detailed Engineering

Location
Kurdistan Region of Iraq
Duration
8 months
Start Date
2024-10-01
Completion Date
2025-06-01
Description

Detail engineering design support for tanker loading expansion to 15,000 BPD, which includes the provision of two (2) loading bays.

Provision of Design and Engineering Services for Firefighting System at CPF Sarqala-1 Wellsite, Garmian Block, Kurdistan

Additional Oil Booster Pump Detailed Engineering

Completed
Client
HKN Atrush Ltd.
Scope of Work

Detailed Design

Location
Kurdistan Region of Iraq
Duration
5 Months
Start Date
2025-11-01
Completion Date
2026-04-01
Description

Detailed Engineering design and documentation for integrating the 3rd Booster Pump into the existing system.

Provision Of Engineering Call-Off Services for Phases 1B, 1C and 1D

Provision Of Engineering Call-Off Services for Phases 1B, 1C and 1D

Completed
Client
Gulf Keystone Petroleum International Ltd.
Scope of Work

GSA

Location
Kurdistan Region of Iraq
Duration
24 Months + 12 Months Extension (Optional)
Start Date
2022-01-01
Completion Date
2025-02-01
Description

Provision of Engineering support on an ad-hoc Call Off basis in developing the Shaikan Field in Northern Kurdistan. This scope include the treatment of oil production, gas processing plant and produced water treatment. Concept of 5,000 BBL per day capacity of EPF was executed as a part of this GSA.

CO9 – Ad-Hoc Engineering Activities

Completed
Client
Gulf Keystone Petroleum International Ltd.
Scope of Work

null

Location
null
Duration
null
Start Date
null
Completion Date
null
Description

cancelled