CO32 – Check of Retaining Wall Design
TBA
This Call-Off Order, under the General Service Agreement (GSA), covers the design calculation review for the PF-1 RC retaining wall.

CO31 – F&G Mapping Report Update
TBA
This Call-Off Order, under the General Service Agreement (GSA), covers the Fire and Gas (F&G) Mapping Study for PF-1, including preparation of an updated F&G Mapping Report, 3D model, and detailed design deliverables for new detectors.

CO30 – F&G Coverage Implementation
TBA
This Call-Off Order, under the General Service Agreement (GSA), covers the detailed engineering work package to implement the recommendations from the Fire and Gas Mapping Study

CO3 – 400V Power Generation and Distribution System – Fault and Load Flow Study
TBA
This Call-Off Order, under the General Service Agreement (GSA), covers electrical system studies of the existing 400V power generation and distribution network, including short circuit, load flow, and motor starting analyses, to assess system capability for plant expansion and support generator synchronization and load sharing upgrades.

CO29 – Fired Heater FH-0232 Modification – Replacement of BMS Panel with DeltaV BMS
null
This Call-Off Order, under the General Service Agreement (GSA), covers the preparation of a basic engineering package for replacement of the existing BMS with a dedicated DeltaV BMS, including vendor coordination and required control system modifications.

CO28 – 400V Power System Upgrade – Generator Option Study
null
cancelled

CO27 – Fired Heater FH-0232 Modifications – Safety Related Modifications
TBA
This Call-Off Order, under the General Service Agreement (GSA), covers fuel gas safety assessment and modifications, including equipment relocation, piping improvements, hazardous area review, and preparation of construction work packages.

CO26 – Existing & New Desalter Design Support
TBA
This Call-Off Order, under the General Service Agreement (GSA), covers engineering support to COMPANY, including vendor design review, document review, technical mark-ups, design alignment checks, and workshop participation.

CO25 – Secondment for Senior Instrument Designer
TBA
This Call-Off Order, under the General Service Agreement (GSA), covers the provision of a Senior Instrument Designer to support COMPANY at its Erbil office.

CO24 – Basic Engineering Design for Amine Unit in PF-2
TBA
This Call-Off Order, under the General Service Agreement (GSA), covers the preparation of a basic engineering package for the Amine Unit in PF-2.

CO23 – Triassic EPF Design Support
TBA
This Call-Off Order, under the General Service Agreement (GSA), covers Process Engineering design for the Triassic Early Production Facility (EPF), including equipment sizing, calculations, datasheets, plot layout, and review of the Basis of Design and Statement of Requirements for tendering.

CO22 – Amine Debottlenecking Study – Peer Review
TBA
This Call-Off Order, under the General Service Agreement (GSA), covers the in-person peer review of the Amine Debottlenecking Study report.