Clear

Engineering Services for Well ST-B2 to Choke Skid Slot B7

Completed
Client
HKN Energy Ltd
Scope of Work

Detailed Engineering

Location
Kurdistan Region of Iraq
Duration
6 months
Start Date
2024-12-01
Completion Date
2025-06-01
Description

Detailed Engineering (Multidiscipline) for Well ST-B2 to Choke Skid Slot B7.

Engineering Services for ST-B1 Debottlenecking

Completed
Client
HKN Energy Ltd
Scope of Work

Study

Location
Kurdistan Region of Iraq
Duration
6 Months
Start Date
2025-02-01
Completion Date
2025-08-01
Description

Support Company with detailed engineering services for produced water treatment ST-B1 Debottlenecking scope and LLI design

Engg Services for the B2 ESP LER

Completed
Client
HKN Energy Ltd
Scope of Work

Detailed Engineering

Location
Kurdistan Region of Iraq
Duration
6 months
Start Date
2025-01-01
Completion Date
2025-07-01
Description

Scope is to undertake the preliminary design for the supply of a new Local Equipment Room (LER) and confirm power generation requirements for new ESP’s in existing B pad wells. Following electrical activities performed during the preliminary design stage:
• Co-ordination with vendors, and COMPANY.
• LER and power system design, control, protection, and operations philosophy
• Design and options review report (IFU).
• Produce LER specification (IFT).
• Produce LER general arrangement (IFD).
• Produce LER layouts (IFD).
• Produce LER & power system SLD’s (IFD).
• Produce power equipment data sheets (IFT) along with all ancillary equipment.
• Produce power system layouts (IFD).
• Produce updated ICSS Architecture Drawing (IFD)
• Various calculations (IFU).

Pre-Bid Engineering Support for EPSCC of NWP AGUP-2 Project

Debottlenecking Detailed Design

Completed
Client
HKN Energy Ltd
Scope of Work

DetailedDesign

Location
Kurdistan Region of Iraq
Duration
3 Months
Start Date
2025-11-01
Completion Date
2026-02-01
Description

Engineering detailed design for the inclusion of a new hydrocyclone in ST-B1, which is a result of the debottlenecking study conducted by ExidaSP. This will include
design of the hydrocyclone and all the associated tie-ins.

Consultancy Services for Sarsang and Atrush Field Gas Processing Facility Study

Consultancy Services for Sarsang and Atrush Field Gas Processing Facility Study

Completed
Client
HKN Energy Ltd
Scope of Work

Safety Study

Location
Kurdistan Region of Iraq
Duration
6 Weeks
Start Date
2021-11-01
Completion Date
2023-01-01
Description

Provision of Consultancy Services for Sarsang and Atrush Field Gas Processing Facility Study. This scope include the treatment of oil production, gas processing plant and produced water treatment.

Confidential

B2 & B5 ESP – Local Equipment Room Detail Design & Procurement Support

Completed
Client
HKN Energy Ltd
Scope of Work

Detailed Design

Location
Kurdistan Region of Iraq
Duration
6 Months
Start Date
null
Completion Date
null
Description

Phase 1 – Site verification to redline mark-up existing Sarsang PAD B P&IDs

TR024 Atrush TLS Project – Phase 1B Piping Stress Analysis Study

Completed
Client
HKN Atrush Ltd.
Scope of Work

Study

Location
Kurdistan Region of Iraq
Duration
1 month
Start Date
2025-03-01
Completion Date
2025-04-01
Description

Pipe stress analysis of for the newly added piping for a tanker loading station at Atrush.

Technical Service for FEED for Full Field Production Facilities of Eridu Oil Field Development Block 10 Project

TLS Phase 2 – Process Detailed Design Support

Completed
Client
HKN Atrush Ltd.
Scope of Work

Process Engineering

Location
Kurdistan Region of Iraq
Duration
2 months
Start Date
2025-06-01
Completion Date
null
Description

Detail engineering design support for tanker loading expansion to 30,000 BPD, which includes the provision of two (2) additional bays. Engineering was done up to 30% Design Review for this stage, allowing COMPANY to allocate budget towards completion of design and construction of these works.

TLS Phase 2 Detailed Design

Completed
Client
HKN Atrush Ltd.
Scope of Work

Detailed Engineering

Location
Kurdistan Region of Iraq
Duration
6 months
Start Date
2025-09-01
Completion Date
2026-03-01
Description

Full multi disciplinary detail engineering design support for tanker loading expansion to 30,000 BPD, which includes the provision of two (2) additional bays. This includes the design and procurement services associated with a new surge vessel, KOD pumps, metering skid, all associated pipeworks, structures, instrumentation, and electrical for this expansion.

Design-Review ADCO 51 OGD Wells and IA Compressor Upgrade 2

Tanker Loading Station Phase 2 – Expansion Detail Design

Completed
Client
HKN Atrush Ltd.
Scope of Work

null

Location
Kurdistan Region of Iraq
Duration
null
Start Date
2025-09-01
Completion Date
null
Description

Detail engineering design of tanker loading expansion to accomodate increased production (45K BPD) which includes the provision of one additional bay.

Gas Treatment Plant at Khurmala Dome Field (EPC Phase)

Tanker Loading Station Phase 2 – Dispersion Study & Surge Analysis

Completed
Client
HKN Atrush Ltd.
Scope of Work

Study

Location
Kurdistan Region of Iraq
Duration
3 Months
Start Date
2025-09-01
Completion Date
2025-12-01
Description

The Services to be provided under the Contract may include, but not be limited to:
Project management;
Detailed Engineering for the 24 inch, 16 Km Pipeline between RETM & KRS2;
Conduct Geo and Topo Survey;
Upgrade the RTU/SCADA Systems;
Carried out Flow Assurance Study to ensure stable oil transport between RETM & KRS2;
Preparation of the PC Scope of Work;
Preparation of the PC Cost Estimate;
Preparation of the PC Schedule;
Preparation of the Project Dossier.

Design-Review ADCO 51 OGD Wells and IA Compressor Upgrade

Tanker Loading Station Phase 1B – Detailed Design

Completed
Client
HKN Atrush Ltd.
Scope of Work

Detailed Design

Location
Kurdistan Region of Iraq
Duration
2 Months
Start Date
2025-11-01
Completion Date
2026-01-01
Description

Detail design based on HAZOP study conducted by Client for tanker loading expansion to 15,000 BPD, which includes the provision of two (2) loading bays.