Nasiriyah & Gharaff Flare Gas Treatment Project – Iraq

Detail Design of Permanent Power Supply through Overhead Line (KPS2 to RETM) and Establishment of New Substation in RETM

Conduct OHTL engineering, covering but not limited to:
11kV OHL Design, 16 km, between KPS2 and RETM;
11 kV Integrated Substation at RETM ;
Electrical Cabling between the OHL and the Integrated New Substation.