Engineering for Rectification of 36 Electrical Category 1 Defects
CLIENT | Kurdistan Pipeline Company Pte Ltd |
SCOPE OF WORK | Engineering |
PROJECT LOCATION | Kurdistan Iraq |
DURATION | 4 Months |
START DATE | Dec-20 |
COMPLETION DATE | Mar-21 |
PROJECT DESCRIPTION | To perform Engineering Design calculations for the repairs and rectification of 36 Electrical Category 1 Defects. To produce Engineering Design calculations, Bill of Quantities, Specifications, Detailed Engineering Drawings for Defects located within Battery Limit of Stations and identify the gap between the design parameters against the operating requirements of the equipment / item / system. The scope also includes conducting site survey, investigation and obtaining all historical as well as present operations data of the equipment / item / system. |