Engineering Study for Rectification of Electrical Defects at KPS0 Station

CLIENT Kurdistan Pipeline Company Pte Ltd
SCOPE OF WORK Engineering
PROJECT LOCATION Kurdistan, Iraq
DURATION 16 Weeks
START DATE Jan-22
COMPLETION DATE May-22
PROJECT DESCRIPTION Engineering study for rectifications works on defective electrical equipment, material, components and instruments. The works include investigation, engineering study, design and engineering documentation and drawings for the systems.