Engineering Study for Rectification of Electrical Defects at KPS0 Station
CLIENT | Kurdistan Pipeline Company Pte Ltd |
SCOPE OF WORK | Engineering |
PROJECT LOCATION | Kurdistan, Iraq |
DURATION | 16 Weeks |
START DATE | Jan-22 |
COMPLETION DATE | May-22 |
PROJECT DESCRIPTION | Engineering study for rectifications works on defective electrical equipment, material, components and instruments. The works include investigation, engineering study, design and engineering documentation and drawings for the systems. |