CO29 – Fired Heater FH-0232 Modification – Replacement of BMS Panel with DeltaV BMS

This Call-Off Order, under the General Service Agreement (GSA), covers the preparation of a basic engineering package for replacement of the existing BMS with a dedicated DeltaV BMS, including vendor coordination and required control system modifications.

CO27 – Fired Heater FH-0232 Modifications – Safety Related Modifications

This Call-Off Order, under the General Service Agreement (GSA), covers fuel gas safety assessment and modifications, including equipment relocation, piping improvements, hazardous area review, and preparation of construction work packages.

CO26 – Existing & New Desalter Design Support

This Call-Off Order, under the General Service Agreement (GSA), covers engineering support to COMPANY, including vendor design review, document review, technical mark-ups, design alignment checks, and workshop participation.

CO25 – Secondment for Senior Instrument Designer

This Call-Off Order, under the General Service Agreement (GSA), covers the provision of a Senior Instrument Designer to support COMPANY at its Erbil office.

CO24 – Basic Engineering Design for Amine Unit in PF-2

This Call-Off Order, under the General Service Agreement (GSA), covers the preparation of a basic engineering package for the Amine Unit in PF-2.

CO23 – Triassic EPF Design Support

This Call-Off Order, under the General Service Agreement (GSA), covers Process Engineering design for the Triassic Early Production Facility (EPF), including equipment sizing, calculations, datasheets, plot layout, and review of the Basis of Design and Statement of Requirements for tendering.

CO22 – Amine Debottlenecking Study – Peer Review

This Call-Off Order, under the General Service Agreement (GSA), covers the in-person peer review of the Amine Debottlenecking Study report.

CO21 – Dispersion Study & ALARP Demonstration

This Call-Off Order, under the General Service Agreement (GSA), covers the validation of the existing QRA contours and ALARP demonstration workshop.

CO20 – Secondment of Senior Piping Designer

This Call-Off Order, under the General Service Agreement (GSA), covers the secondment of a Senior Piping Designer to support COMPANY at its Shaikan site office.