CPF1 Tanker Loading Engineering Detailed Design – Phase 1
Detail engineering design support for tanker loading expansion to 15,000 BPD, which includes the provision of two (2) loading bays.
Detail engineering design support for tanker loading expansion to 15,000 BPD, which includes the provision of two (2) loading bays.
Detailed Engineering design and documentation for integrating the 3rd Booster Pump into the existing system.
Provision of Engineering support on an ad-hoc Call Off basis in developing the Shaikan Field in Northern Kurdistan. This scope include the treatment of oil production, gas processing plant and produced water treatment. Concept of 5,000 BBL per day capacity of EPF was executed as a part of this GSA.
cancelled
This Call-Off Order, under the General Service Agreement (GSA), covers technical bid evaluation support for the Desalter and PW System, including review of vendor documentation, fabrication details, and proposed project schedule.
This Call-Off Order, under the General Service Agreement (GSA), covers the feasibility study of the existing desalter package.
This Call-Off Order, under the General Service Agreement (GSA), covers the peer review of the Desalting Invitation to Tender (ITT) documentation.
This Call-Off Order, under the General Service Agreement (GSA), covers the preparation of a hazardous area classification study using existing HAC documentation, plot plans, and site survey data.
This Call-Off Order, under the General Service Agreement (GSA), covers the engineering design for the SH-M/N Wellhead Manifold, including P&IDs, 3D model, layouts, isometrics, bill of materials, instrument datasheets, hookup drawings, and control philosophy.
This Call-Off Order, under the General Service Agreement (GSA), covers the preparation of the full Issued for Construction (IFC) design package for three cable racks.