Tanker Loading Station Phase 2 – Dispersion Study & Surge Analysis

The Services to be provided under the Contract may include, but not be limited to:
Project management;
Detailed Engineering for the 24 inch, 16 Km Pipeline between RETM & KRS2;
Conduct Geo and Topo Survey;
Upgrade the RTU/SCADA Systems;
Carried out Flow Assurance Study to ensure stable oil transport between RETM & KRS2;
Preparation of the PC Scope of Work;
Preparation of the PC Cost Estimate;
Preparation of the PC Schedule;
Preparation of the Project Dossier.

Tanker Loading Station Phase 1B – Detailed Design

Detail design based on HAZOP study conducted by Client for tanker loading expansion to 15,000 BPD, which includes the provision of two (2) loading bays.

Supply of TLS-2 Field Instruments

Procurement service

Supply of Choke Valve

Procurement service

Supply of TLS Valve Spares

Procurement service

Lightning Protection Materials

Procurement service

HAZOP Workshop

Hosting a HAZOP safety workshop through the utilization of a third-party workshop Chairman and Scribe for the Atrush existing EPF.

Gas Cap Management Concept Study

Review the CPF and gathering system infrastructure to determine maximum available system capacity to process additional gas production from the CK-23 GCM well. This includes a PipeSim model to check the adequacy of the gathering system and a Flarenet simulation to check the adequacy of the flare for the additional gas.

Electrical & Instrumentation Works

Additional work and punch clearing activities

Earthing and Lightning Protection

Provide a program to review, inspect, evaluate, test, and advise on modications and or upgrades for earthing & lightning protection systems within speci??c areas at the Atrush Field to identify and mitigate areas with high earthing resistance, which have compromised system performance and safety during lightning events.