Supply of PSV & Globe Control Valve
Supply of PSV & Globe Control Valve
Supply of PSV & Globe Control Valve
Supplying a deoiling hydrocyclone vessel spares to Sarsang field for oil-water separation of produced water.
Supplying a deoiling hydrocyclone vessel to Sarsang field for oil-water separation of produced water.
Procurement service
Support Company by providing detailed design engineering services associated with filter skid package
Provide qualified resources to support Company by providing detailed design engineering services associated with filter skid package
Provide piping stress analysis services for the ST-2 system in support of Company’s project to re-route oil and water via two (2) straight pipes of considerable length to a nearby off-spec tank
Update ETAP model and conduct Power System Studies to verify system adequacy, identify limitations, and recommend improvements for safe and reliable operation under current and future scenarios
Phase 1 – Site verification to redline mark-up existing Sarsang PAD B P&IDs
The scope of work outlines the requirements for the detailed design phase of a project involving the disposal of produced water. The design includes facilities at two areas: Pad A, for water from the ST-2 facility, and Pad B for water from the ST-1 facility, with these facilities requiring spumps, filters, chemical injection packages, degassers, and flexible (Soluforce) pipelines. This scope is a full-fledged multidisciplinary Detailed Engineering scope including Process, Piping, Electrical, Instrumentation, Mechanical, and Pipeline deliverables. This also includes Procurement Services, such as preparation of MRs, TBEs, and Vendor Document Review.