Provision of Project Support Services for West Qurna 2
To provide manpower services for the Provision of Project Support Services for West Qurna 2 in the Republic of Iraq.
To provide manpower services for the Provision of Project Support Services for West Qurna 2 in the Republic of Iraq.
To provide Operation & Maintenance (O&M) Services for Petronas Carigali Iraq Holding B.V. on behalf of Italfluid.
Provision of Design, Supply and Configuration of DCS & Integrated Safety System for Leased Oil Train, Petronas, Iraq.
Provision of Site/Construction Supervision for Petronas Carigali Iraq Holding B.V. on behalf of Italfluid.
Engineering design works for 30,000 BBL per day including but not limited to the detailed Engineering design, record drawings and documentation.
Provision of HAZOP, IPF & HAZID Studies for the Provision of Leased Oil Train Including Operations and Maintenance for Petronas Carigali Iraq Holding B.V (PCIHBV).
This project involves the development of a greenfield oil and gas production facility concept to support future field development and production operations. The scope includes establishing the design basis, developing early-stage engineering deliverables, and preparing both equipment factored cost estimates and an AACE Class 5 cost estimate using Questor to support technical and commercial decision-making. Engineering activities cover process definition, conceptual facility configuration, major equipment identification, pipeline routing and sizing, utilities assessment, and infrastructure planning aligned with production and export requirements. The study will also define key operating philosophies, environmental considerations, and project assumptions to guide future FEED and detailed engineering stages. Deliverables include concept engineering documents, equipment and Questor-based cost models, assumptions registers, and executive presentation materials to support stakeholder reviews and project governance.
Scope covers converting all their existing E3D models to Plant3D
– 5 x pipe specs to be created for Plant 3D, Sarsang Pipe Spec (01C3N, 03C3N, 06C3N) and Atrush Pipe Spec (A15DS, A30DS).
– Remodelling of the existing design using Plant 3D (Using a NAVISWORK model forreference). Hours based on 100 isometrics
Provide one (1) Senior Piping Engineer (Steve Cooke) to prepare a total of nine (9) construction work packs associated with Company’s 2025 Turnaround Optimization Project
A Tanker Loading Station (TLS) is proposed as a fast-track project to enhance export flexibility in the Atrush field, addressing the current limitation of pipeline-only exports. The TLS will facilitate crude oil loadout for transportation to regional refineries via road. The project involves relocating an existing two-bay loading station to Terrace 4 within the Atrush CPF facility, aiming for completion within 60 days of award. Construction will occur in two phases: Phase One will provide approximately 15,000 barrels of oil per day (bopd) using existing equipment, while Phase Two will expand capacity to approximately 45,000 bopd by adding three additional twin-arm loading stations. The scope includes validating the Phase 1 engineering proposal and managing associated risks.
Conducted Flow Assurance Study for the Soluforce Crude Oil Loading System.