Provision of Project Management Consultancy (PMC) for Halfaya Oil Field Surface Facility Phase II

Halfaya Oil Field Phase 2 Expansion
100k BOPD to 200k BOPD
Carry out the PMC for PetroChina Halfaya Phase 2-Iraq:
Oil and Gas Train Units;
Gas Compression Systems;
Lift Compression Systems
150MMscfd Gas Receiving Station (GRS);
3x10MW Gas Turbine Power Plant;
Roads, Camps, others.
Provision of all site procedures, HSE, QA/QC, etc. and PMC Team for Project, Engineering & Construction Management of the Project Execution Phase.

HAZOP and or HAZID and SIL Study

Carry out the HAZOP and HAZID Study for Halfaya Phase 1 Oil and Gas Facility.

Supporting OiLSERV on Various Projects

Engineering Support for different Projects for DNO, HUNT OIL, TAQA, GAS PLUS, CHEVRON and EXXON. The scope includes design, pre-commissioning of different capacity of EPF facilities.

Safety Study of Anokyi Mainline Compressor Station (AMCS) Phase II EPCC Project

To conduct the following study for the Anokyi Mainline Compressor Station (AMCS) Phase II EPCC Project of Meridian Logistic and Engineering (MLE) on behalf of Ghana National Gas Company:
SIMOPS study;
HAZOP study;
SIL (LOPA) study;
FERA; and
QRA study.

On-Site Translation and Interpretation Support for the West Qurna (Phase 2) Project

To provide manpower for On-Site Translation and Interpretation Support in connection with exploration, appraisal, development, and production of the West Qurna (Phase 2) Contract Area.

FEED Design of Fire Suppression System

FEED for Fire Suppression System at three main stations of KPS1, KPS2 and RETM.

Engineering Study for Rectification of Electrical Defects at KPS0 Station

Engineering study for rectifications works on defective electrical equipment, material, components, and instruments. The works include investigation, engineering study, design and engineering documentation and drawings for the systems.

Engineering for Rectification of 36 Electrical Category 1 Defects

To perform Engineering Design calculations for the repairs and rectification of 36 Electrical Category 1 Defects.
To produce Engineering Design calculations, Bill of Quantities, Specifications, Detailed Engineering Drawings for Defects located within Battery Limit of Stations and identify the gap between the design parameters against the operating requirements of the equipment / item / system.
The scope also includes conducting site survey, investigation and obtaining all historical as well as present operations data of the equipment / item / system.

Detail Design of Permanent Power Supply through Overhead Line (KPS2 to RETM) and Establishment of New Substation in RETM

Conduct OHTL engineering, covering but not limited to:
11kV OHL Design, 16 km, between KPS2 and RETM;
11 kV Integrated Substation at RETM ;
Electrical Cabling between the OHL and the Integrated New Substation.

Detail Design Engineering of RETM-KRS2 Pipeline

The Services to be provided under the Contract may include, but not be limited to:
Project management;
Detailed Engineering for the 24 inch, 16 Km Pipeline between RETM & KRS2;
Conduct Geo and Topo Survey;
Upgrade the RTU/SCADA Systems;
Carried out Flow Assurance Study to ensure stable oil transport between RETM & KRS2;
Preparation of the PC Scope of Work;
Preparation of the PC Cost Estimate;
Preparation of the PC Schedule;
Preparation of the Project Dossier.