Peshkabir Gas Project

CLIENT DNO Iraq AS
SCOPE OF WORK Engineering Support
PROJECT LOCATION Kurdistan, Iraq
DURATION 8 Weeks
START DATE Jun-18
COMPLETION DATE Jul-18
PROJECT DESCRIPTION Engineering Support for the Peshkabir Gas Project to provide Pre-FEED team that shall perform engineering to enable a FEED contract to be awarded for the Peshkabir Gas Project Facilities at the Peshkabir, Tawke and Fishkhabour sites and provide all records / documentation necessary for the complete performance of this scope.

HAZOP Support for Avantgardre Project

CLIENT DNO Iraq AS
SCOPE OF WORK Engineering Support
PROJECT LOCATION Nigeria
DURATION 1 month
START DATE Mar-16
COMPLETION DATE Apr-16
PROJECT DESCRIPTION Expert technical support for HAZOP review of FPSO Project skid packages.

FPSO Project

CLIENT DNO Iraq AS
SCOPE OF WORK Engineering Support
PROJECT LOCATION Nigeria
DURATION 1 month
START DATE Feb-16
COMPLETION DATE Mar-16
PROJECT DESCRIPTION Calculation and design review of pumps in FPSO Skid.

Different Projects

CLIENT DNO Iraq AS
SCOPE OF WORK Engineering Support
PROJECT LOCATION Nigeria
DURATION 1 month
START DATE Jun-15
COMPLETION DATE Jul-15
PROJECT DESCRIPTION
  • Process and Piping review of Water bath heaters and Slug catcher design. Scope involved review of P&ID’s, Datasheets and other design documentation to ensure the adequacy of the design and correctness of Material Take offs
  • Engineering works for Slug Cather and Fuel gas skid. Preparation of Nozzle Orientation, Piping Isometrics, Piping Supports design, cable routing for Electrical and instrumentation inside the skids.
  • Process review of Water bath heaters. P&ID’s, Datasheets and document review and verification of Water bath heaters and Material Take off review of the skids.

ADCO RMS stations upgrade Project

CLIENT DNO Iraq AS
SCOPE OF WORK Engineering Support
PROJECT LOCATION Abu Dhabi, UAE
DURATION 1 month
START DATE Apr-15
COMPLETION DATE May-15
PROJECT DESCRIPTION Provided support for Mechanical handling study, RAM study, Datasheets and Specifications of Mechanical Equipment.

Gas Treatment Plant at Khurmala Dome Field (EPC Phase)

CLIENT DNO Iraq AS
SCOPE OF WORK Engineering Support
PROJECT LOCATION Iraq
DURATION 1 month
START DATE Apr-15
COMPLETION DATE May-15
PROJECT DESCRIPTION HAZOP Review