Provision of Third Party Technical Review for Paloch De-Bottlenecking (DBN) Facilities

CLIENT Dar Petroleum Operating Company
SCOPE OF WORK Study
PROJECT LOCATION South Sudan
DURATION 4 Months
START DATE Jul-23
COMPLETION DATE Nov-24
PROJECT DESCRIPTION

Evaluate the Process Issues with the aim of de-bottlenecking the facility to achieve the original design intent. Conduct Site Visit and Sampling to inform de-bottlenecking recommendations. Adhere to DPOC Standards & Codes, South Sudan’s Rules, Regulations, and Laws, and International Standards and Best Practice

Fire Gas Detection – Layout Assessment

CLIENT Dar Petroleum Operating Company
SCOPE OF WORK Study
PROJECT LOCATION Kurdistan, Iraq
DURATION 5 Weeks
START DATE Sept-22
COMPLETION DATE Dec-22 (Extension)
PROJECT DESCRIPTION

The scope of work for this project is limited to:
• Assess the robustness and reliability of the mitigation barrier associated with the existing point detector network for the detection/confirmation of a flammable and/or toxic gas release with the existing LOS detection system removed from the Safety Instrumented System (SIS);
• Study to evaluate whether the point detected currently provided is adequate. If inadequate, include a pragmatic recommendation to achieve the required barrier robustness.
• The study shall be limited to FZ-4 & FZ-9.
• The coverage of the detectors considered in the study is manufactured by M/S DECTON as indicated in section 3.2 Scope of Work document

Peshkabir 2nd Stage Gas Capture / Tawke AGI Optimization Concept Techno-Economic Screening Study Proposal

CLIENT Dar Petroleum Operating Company
SCOPE OF WORK Study
PROJECT LOCATION Kurdistan, Iraq
DURATION 7 Weeks
START DATE Feb-22
COMPLETION DATE Mar-22
PROJECT DESCRIPTION To explore possible options and provide recommendation for the Peshkabir 2nd stage separator associated gas capture and enhance the gas handling compression and injection.

Peshkabir 2nd Stage Gas Capture / Tawke AGI Optimization Concept Techno-Economic Screening Study Proposal

CLIENT Dar Petroleum Operating Company
SCOPE OF WORK Study
PROJECT LOCATION Kurdistan, Iraq
DURATION 7 Weeks
START DATE Feb-22
COMPLETION DATE Dec-22
PROJECT DESCRIPTION To explore possible options and provide recommendation for the Peshkabir 2nd stage separator associated gas capture and enhance the gas handling compression and injection.

Consultancy Services for Sarsang and Atrush Field Gas Processing Facility Study

CLIENT Dar Petroleum Operating Company
SCOPE OF WORK Study
PROJECT LOCATION Kurdistan, Iraq
DURATION 6 Weeks
START DATE Nov-21
COMPLETION DATE Jan-23 (Extension)
PROJECT DESCRIPTION

Provision of Consultancy Services for Sarsang and Atrush Field Gas Processing Facility Study

Safety Study of Anokyi Mainline Compressor Station (AMCS) Phase II EPCC Project

CLIENT Dar Petroleum Operating Company
SCOPE OF WORK Study
PROJECT LOCATION Ghana
DURATION 6 Months
START DATE May-21
COMPLETION DATE Oct-21
PROJECT DESCRIPTION

To conduct the following study for the Anokyi Mainline Compressor Station (AMCS) Phase II EPCC Project of Meridian Logistic and Engineering (MLE) on behalf of Ghana National Gas Company:

  • SIMOPS study;
  • HAZOP study;
  • SIL (LOPA) study;
  • FERA; and
  • QRA study.

Safety Study of Anokyi Mainline Compressor Station (AMCS) EPCC Project

CLIENT Dar Petroleum Operating Company
SCOPE OF WORK Study
PROJECT LOCATION Ghana
DURATION 6 months
START DATE Nov-18
COMPLETION DATE May-19
PROJECT DESCRIPTION

To conduct the following study for the Anokyi Mainline Compressor Station (AMCS) EPCC Project of Meridian Logistic and Engineering (MLE) on behalf of Ghana National Gas Company

  • SIMOPS study;
  • HAZOP study;
  • LOPA study;
  • SIL study; and
  • QRA study.

Provision to Perform Plant Safe Operating Limits Gap Analysis and Produce the Latest Revision of Safe Operating Limit Documents

CLIENT Dar Petroleum Operating Company
SCOPE OF WORK Study
PROJECT LOCATION Basra, Iraq
DURATION 5 months
START DATE Jul-17
COMPLETION DATE Dec-17
PROJECT DESCRIPTION

Perform the First Commercial Production (FCP) and Offsite Facility Safe Operating Limit (SOL) latest revision through the following process:

  • Perform SOL Needs Assessment and Identify SOL Gap Analysis;
  • Establish SOL Mapping Exercise;
  • Prioritization of SOL documents and Gap Closure;
  • Creating and Updating of SOL Documents to the latest revision.

Provision to Perform Process Safety Information (PSI) Needs Analysis

CLIENT Dar Petroleum Operating Company
SCOPE OF WORK Study
PROJECT LOCATION Basra, Iraq
DURATION 4 months
START DATE Jan-17
COMPLETION DATE May-17
PROJECT DESCRIPTION

To deliver the complete Process Safety Information (PSI) Needs Analysis Report including but not limited to:

  • Process Safety Information (PSI) Needs Analysis Report;
  • Presentation material outlining the salient point of the report;
  • Native simulation files.

SIL Verification of Field Instruments – Paraffinic Naphtha Tanks Replacement (ADGAS) Project

CLIENT Dar Petroleum Operating Company
SCOPE OF WORK Study
PROJECT LOCATION UAE
DURATION 3 months
START DATE Jun-16
COMPLETION DATE Sep-16
PROJECT DESCRIPTION Assist ADGAS and Target Engineering Const. Co. (LLC) by performing SIL Verification for the Paraffinic Naphtha Tanks Replacement Project.