Safety Study of Anokyi Mainline Compressor Station (AMCS) EPCC Project

Safety Study of Anokyi Mainline Compressor Station (AMCS) EPCC Project

Completed
Client
Encryo n(Hong Kong) Co. Limited n[For Meridien Logistic and Engineering (MLE) on behalf of Ghana National Gas Company]
Scope of Work

Safety Study

Location
Ghana
Duration
6 months
Start Date
2018-11-01
Completion Date
2019-05-01
Description

To conduct the following study for the Anokyi Mainline Compressor Station (AMCS) EPCC Project of Meridian Logistic and Engineering (MLE) on behalf of Ghana National Gas Company
SIMOPS study;
HAZOP study;
LOPA study;
SIL study; and
QRA study.

Project Management Services Agreement

PWI Pump Skid Stress Analysis

Completed
Client
DXP
Scope of Work

Detailed Engineering

Location
Kurdistan Region of Iraq
Duration
1 month
Start Date
2025-09-01
Completion Date
2025-10-01
Description

Provide pump package stress, structural stress and lifting analysis for PW Pump Skid.

DNO North Iraq Topping Facility

DNO North Iraq Topping Facility

Completed
Client
DNO MIDDLE EASTn(A BRANCH OFFICE OF DNO IRAQ AS)
Scope of Work

Safety Study

Location
Kurdistan Region of Iraq
Duration
1 month
Start Date
2008-12-01
Completion Date
2008-12-01
Description

Safety Design Review - DNO North Iraq Topping Facility.

Provision of Engineering Services

Completed
Client
DNO Iraq AS
Scope of Work

GSA

Location
Kurdistan Region of Iraq
Duration
24 Months
Start Date
2019-02-01
Completion Date
2021-02-01
Description

To perform engineering, detailed design including all analyses, procurement personnel support, preparation of operation and maintenance manuals, Commissioning and Start–up assistance to Company’s Operations Group as required and for the provision of all records / documentation necessary for the complete performance of the Work.
Also responsible for all aspects of the Services, with regard to Health, Safety, Security and Environmental (HSSE) performance, quality management, schedule, cost, and functionality.

Provision of Engineering for Pipeline River Crossing on Single Span Bridge Design

Provision of Engineering for Pipeline River Crossing on Single Span Bridge Design

Completed
Client
DNO Iraq AS
Scope of Work

Detailed Engineering

Location
Kurdistan Region of Iraq
Duration
90 Days
Start Date
2022-10-01
Completion Date
2023-01-01
Description

This pipeline traverses over the Khabour River via an underwater crossing, at which the original design was to bury the pipeline below the riverbed. During recent inspections, it was found that the pipeline was exposed at the Tawke side of the river crossing, and approximately 15 to 20m length of the pipeline was found to be unsupported.

Peshkabir Gas Project

Peshkabir Gas Project

Completed
Client
DNO Iraq AS
Scope of Work

Detailed Engineering

Location
Kurdistan Region of Iraq
Duration
8 Weeks
Start Date
2018-06-01
Completion Date
2018-07-01
Description

Engineering Support for the Peshkabir Gas Project to provide Pre-FEED team that shall perform engineering to enable a FEED contract to be awarded for the Peshkabir Gas Project Facilities at the Peshkabir, Tawke and Fishkhabour sites and provide all records / documentation necessary for the complete performance of this scope.

Peshkabir 2nd Stage Gas Capture Tawke AGI Optimization Concept Techno-Economic Screening Study Proposal

Peshkabir 2nd Stage Gas Capture / Tawke AGI Optimization Concept Techno-Economic Screening Study Proposal

Completed
Client
DNO Iraq AS
Scope of Work

Concept

Location
Kurdistan Region of Iraq
Duration
7 Weeks
Start Date
2022-02-01
Completion Date
2022-12-01
Description

To explore possible options and provide recommendation for the Peshkabir 2nd stage separator associated gas capture and enhance the gas handling compression and injection.

Provision of Third Party Technical Review for Paloch De-Bottlenecking (DBN) Facilities

Provision of Third Party Technical Review for Paloch De-Bottlenecking (DBN) Facilities

Completed
Client
Dar Petroleum Operating Company
Scope of Work

Technical Audit

Location
South Sudan
Duration
11 Months
Start Date
2023-07-01
Completion Date
2024-06-01
Description

Evaluate the Process Issues with the aim of de-bottlenecking the facility to achieve the original design intent. Conduct Site Visit and Sampling to inform de-bottlenecking recommendations. Adhere to DPOC Standards & Codes, South Sudan’s Rules, Regulations, and Laws, and International Standards and Best Practice

Gas Treatment Plant at Khurmala Dome Field (EPC Phase)

Gas Treatment Plant at Khurmala Dome Field (EPC Phase)

Completed
Client
Custom Process Equipment, LLC n(CPE -LLC)
Scope of Work

Detailed Engineering

Location
Iraq
Duration
1 month
Start Date
2015-04-01
Completion Date
2015-05-01
Description

HAZOP Review

Provision of SOH Compressor Piping Design Support

Completed
Client
Crescent Petroleum / Pearl Petroleum Company Limited (PPCL)
Scope of Work

Detailed Engineering

Location
Kurdistan Region of Iraq
Duration
1 Month
Start Date
2026-04-01
Completion Date
2026-05-01
Description

Preparation of a detailed engineering package for the piping tie-ins related to the installation of a reciprocating compressor package in Khormor Facilities. ExidaSP shall develop a 3D model in CADWorx for the piping tie-ins associated with the reciprocating compressor package, including the inlet piping, outlet piping, flare piping, fuel gas piping, instrument air piping, and nitrogen piping.
Conduct piping stress analysis using Caesar II for all tie-in lines to confirm compliance with applicable piping codes, design criteria, and COMPANY specifications.
Prepare the related isometrics and a Material Take-Off (MTO) for all piping tie-in lines covered under the scope.

Engineering of LPG Bullets Maintenance Depressurization Piping

Completed
Client
Crescent Petroleum / Pearl Petroleum Company Limited (PPCL)
Scope of Work

Detailed Engineering

Location
Kurdistan Region of Iraq
Duration
3 months
Start Date
2026-01-01
Completion Date
2026-06-01
Description

This project involves the detailed engineering design of a new blowdown system for ten LPG storage bullets at the Khor Mor LPG Plant operated by Pearl Petroleum in the Kurdistan Region. The objective is to enable safe, controlled, and independent depressurization of each LPG bullet without interrupting truck loading operations. The proposed system will route blowdown vapors from each bullet to a common header connected to the existing flare system, ensuring compliance with ASME B31.3, API 521, and COMPANY isolation philosophy requirements. The scope includes piping, structural, and stress analysis design, tie-in engineering, 3D modeling, material take-offs, and HAZOP review to enhance operational flexibility, safety, and environmental compliance. Additionally, the project includes assessment and optimization of the existing cold vent system using DNV PHAST dispersion analysis.

Technical Service for FEED for Full Field Production Facilities of Eridu Oil Field Development Block 10 Project

Engineering of Additional LPG Loading Pumps

Completed
Client
Crescent Petroleum / Pearl Petroleum Company Limited (PPCL)
Scope of Work

Engineering

Location
Kurdistan Region of Iraq
Duration
22 Weeks
Start Date
2025-05-01
Completion Date
2025-12-01
Description

Engineering and Design of additional LPG loading pumps at the Khor Mor LPG Plant to handle increased capacity from the new KM250A train. The scope includes detailed design, site survey, and integration of new pumps and systems to support 1,600 MT/day loading capacity.