Detailed Design for Business Continuity - Gas In, Gas Out

Detailed Design for Business Continuity – Gas In, Gas Out

Completed
Client
Crescent Petroleum / Pearl Petroleum Company Limited (PPCL)
Scope of Work

Detailed Design

Location
Kurdistan Region of Iraq
Duration
18 Weeks
Start Date
2025-05-01
Completion Date
2025-11-01
Description

Detailed design for emergency bypass routes at Khor Mor LPG Plant to ensure continued export of Natural Gas and NGL during security-related disruptions, enabling direct flow from inlet separators to export lines.

Flare and Relief Sizing Verification Services

Flare and Relief Sizing Verification Services

Completed
Client
CPECC/Exxon
Scope of Work

Detailed Engineering

Location
Iraq
Duration
2 Months
Start Date
2023-06-01
Completion Date
2023-07-01
Description

Work to be provided comprise the following:
Perform a detailed design verification of the Flare and Relief Systems for the West Qurna I (WQI) Oil Trains 2 and 3 located at Degassing Station 7 (DS7) and Degassing Station 6 (DS6);
Lead the flare and relief sizing verification works;
Integrated Engineering Management Team;
Performing Sizing Calculations
Review of Flare Net Model Network;
Study for Acoustically Induced Vibration (AIV) for PSVs
Flare radiation / dispersion Calculations Excluded for 3rd Party Scope

Different Projects

Different Projects

Completed
Client
CPECC BEB
Scope of Work

Detailed Engineering

Location
Algeria
Duration
24 months
Start Date
2015-12-01
Completion Date
2017-12-01
Description

Appointed by CPECC BEB to provide engineering support for their office in Dubai and provide engineers in different disciplines to support:
Algeria Projects Support.

Rovuma LNG Project – Pioneer Camp & Optional Scopes

Rovuma LNG Project – Pioneer Camp & Optional Scopes

Completed
Client
CPECC
Scope of Work

Pre-Bid Engineering

Location
Mozambique
Duration
3 months
Start Date
2018-07-01
Completion Date
2018-10-01
Description

Pre-Bid Engineering and Preparation of full Technical Proposal for the Provision of EPCC and O&M for Mozambique Rovuma Venture S.p.A (MRV) Pioneer Camp (150,000 m2) which includes offices, 500 bed accommodation, helipad and complete support facilities enable camp to be self-sufficient during operation. MRV may choose to expand the Pioneer Camp to 900–person (additional 400) and provide additional road infrastructure.

Afungi Pioneer Camp EPC

Afungi Pioneer Camp EPC

Completed
Client
CPECC
Scope of Work

Pre-Bid Engineering

Location
Mozambique
Duration
3 months
Start Date
2015-03-01
Completion Date
2015-06-01
Description

Proposal and pre-bid engineering

Technical Service for WQ2 Yamama Re-Feed Project Gathering System (Package B1 and B2)

Completed
Client
CPE/LukOil
Scope of Work

FEED

Location
Iraq
Duration
3 months
Start Date
2025-02-01
Completion Date
2026-04-01
Description

Re-FEED for the Yamama Field since the plateau was changed from 650 MBOPD to 350 MBOPD. The scope is limited to B1/B2 package with new well pads and wells along with the tie-in to the pilot wells. This scope include the treatment of oil production, gas processing plant and produced water treatment.

FEED and Detailed Engineering

FEED and Detailed Engineering

Completed
Client
CPE- Al Noor
Scope of Work

FEED, Detailed Engineering

Location
Iraq
Duration
14 months
Start Date
2013-09-01
Completion Date
2015-01-01
Description

Appointed by CPE to establish their Dubai office in accordance with Best International Practices.
Worked with CPE Management to provide Corporate Procedures – HSE, QA/QC, Procurement, etc. to obtain ISO qualification for the Dubai Office.
Provided Senior Engineer Teams for execution of Major Projects in Iraq:
Different projects for Petronas-Iraq;
Halfaya Works for PetroChina-Iraq.

Technical Service for Engineering Projects in MEDC for Year 2023 & 2024

Technical Service for Engineering Projects in MEDC (2023- 2024)

Completed
Client
CPE
Scope of Work

Engineering Manpower

Location
UAE
Duration
24 Months
Start Date
2022-12-01
Completion Date
2024-12-01
Description

Provide required Technical Service to support COMPANY for carrying out design engineering, detailed engineering, technical support for procurement activities such as; Material Requisitions (MRs), Technical Bids Evaluations (TBEs) & Vendor Data Requirements (VDRs), as well as support for the project management, planning, control, cost control, document control, construction, and commissioning Work, as required.

Confidential

Completed
Client
Confidential
Scope of Work

Safety Study

Location
Confidential
Duration
2 Months
Start Date
2013-02-01
Completion Date
2013-04-01
Description

Carry out the HAZOP, HAZID and SIL Study for Oil and Gas Facility.

Confidential

Confidential

Completed
Client
CNPC/CPE
Scope of Work

Safety Study

Location
Confidential
Duration
2 Months
Start Date
2013-07-01
Completion Date
2013-09-01
Description

Carry out the HAZOP, HAZID and SIL Study for Oil and Gas Facility.

Provision of Engineering Services

Completed
Client
BL Energy
Scope of Work

Detailed Engineering

Location
UAE/Iraq
Duration
-
Start Date
2019-10-01
Completion Date
2022-04-01
Description

To provide Engineering Support for different ongoing Projects.

Secondment Agreement – Process Engineer

Secondment Agreement – Process Engineer

Completed
Client
Assala Energy UK Limited
Scope of Work

Engineering Manpower

Location
UK/Gabon
Duration
3 Months (Extendable)
Start Date
2024-06-01
Completion Date
2024-09-01
Description

Provide facilities conceptual engineering, cost estimating, and business case development support for early-stage brownfield projects, including GHG emissions reduction opportunities and stewardship. Offer overall project management support, coordinating multi-discipline activities and external contractors to develop innovative and feasible project solutions.