Call-Off Contract for the Provision of Engineering Consultancy Services

CLIENT TAQA Atrush BV
SCOPE OF WORK Engineering (GSA)
PROJECT LOCATION Kurdistan, Iraq
DURATION 12 months
START DATE May-23
COMPLETION DATE Apr-24
PROJECT DESCRIPTION

The Services to be provided under the Contract may include, but not be limited to:

  • Feasibility studies and frontend engineering studies;
  • Detailed design activities, including preparation of procurement documentation (invitation to tender packages) and technical bid evaluations;
  • Provision of personnel to work within TAQA’s organization;

The provision of any other work and Services incidental to the foregoing including ‘as building’ documentation, survey works, minor plant changes, etc.

Project Management Site Services

CLIENT TAQA Atrush BV
SCOPE OF WORK Engineering (GSA)
PROJECT LOCATION Kurdistan, Iraq
DURATION 12 Months
START DATE Mar-23
COMPLETION DATE Feb-24
PROJECT DESCRIPTION

Contractor shall provide the required personnel, and personnel management to support TAQA’s project activities as required.

Detailed Design Study for Sour Gas Incinerator with WHRU

CLIENT TAQA Atrush BV
SCOPE OF WORK Engineering (GSA)
PROJECT LOCATION Kurdistan, Iraq
DURATION 5 months
START DATE Feb-23
COMPLETION DATE Jun-23
PROJECT DESCRIPTION

Install a MODIFICATION that includes a Sour Gas Incinerator with associated Waste Heat Recovery Unit (WHRU). This will reduce the visible flare by burning the Gas in the Incinerator. The high temperature exhaust gas from the Incinerator will pass through a WHRU, which shall be integrated into a New Hot Oil System, which is used for on-site process heating requirements.

Fire Gas Detection – Layout Assessment

CLIENT TAQA Atrush BV
SCOPE OF WORK Engineering (GSA)
PROJECT LOCATION Kurdistan, Iraq
DURATION 5 Weeks
START DATE Sept-22
COMPLETION DATE Dec-22 (Extension)
PROJECT DESCRIPTION

The scope of work for this project is limited to:
• Assess the robustness and reliability of the mitigation barrier associated with the existing point detector network for the detection/confirmation of a flammable and/or toxic gas release with the existing LOS detection system removed from the Safety Instrumented System (SIS);
• Study to evaluate whether the point detected currently provided is adequate. If inadequate, include a pragmatic recommendation to achieve the required barrier robustness.
• The study shall be limited to FZ-4 & FZ-9.
• The coverage of the detectors considered in the study is manufactured by M/S DECTON as indicated in section 3.2 Scope of Work document

Provision of Engineering and Site support Service

CLIENT TAQA Atrush BV
SCOPE OF WORK Engineering (GSA)
PROJECT LOCATION Kurdistan, Iraq
DURATION 12 Months
START DATE Aug-21
COMPLETION DATE Aug-22
PROJECT DESCRIPTION To provide PMC Services to support TAQA’s operation in Atrush Block.

Provision of Engineering Services

CLIENT TAQA Atrush BV
SCOPE OF WORK Engineering (GSA)
PROJECT LOCATION Kurdistan, Iraq
DURATION 30 Months
START DATE Nov-19
COMPLETION DATE May-22
PROJECT DESCRIPTION

To perform Feasibility studies and front-end engineering studies, Detailed design activities including preparation of procurement documentation (invitation to tender packages) and technical bid evaluations, provision of personnel to work within TAQA’s organization, and provision of any other work and Services incidental to the foregoing including ‘as building’ documentation, survey works, minor plant changes, etc.

  • Call-Off Order No. 01 - Transition of TAQA documents from the previous templates to the new corporate branded templates.