Provision of Design and Engineering Services for Firefighting System at CPF Sarqala-1 Wellsite, Garmian Block, Kurdistan
CLIENT | Confidential |
SCOPE OF WORK | FEED & Detailed Engineering |
PROJECT LOCATION | Kurdistan, Iraq |
DURATION | Approx. 18 Months |
START DATE | Oct-20 |
COMPLETION DATE | Nov-21 |
PROJECT DESCRIPTION | Carry out all necessary Engineering works related to Fire-fighting system for CPF S-1 Facilities in accordance with NPFA standard. The firefighting equipment consist of Water Supply, Fire Water Tanks feeding the Fire Ring; Fire Pumps; Hydrants, Hydro-Foam Monitors, Post Indicator Valves; Deluge system at the new tanks; Sprinklers under the roof over loading bay and portable and wheeled fire extinguishers. |