Provision of Third Party Technical Review for Paloch De-Bottlenecking (DBN) Facilities

CLIENT Dar Petroleum Operating Company
SCOPE OF WORK Study
PROJECT LOCATION South Sudan
DURATION 4 Months
START DATE Jul-23
COMPLETION DATE Nov-24
PROJECT DESCRIPTION

Evaluate the Process Issues with the aim of de-bottlenecking the facility to achieve the original design intent. Conduct Site Visit and Sampling to inform de-bottlenecking recommendations. Adhere to DPOC Standards & Codes, South Sudan’s Rules, Regulations, and Laws, and International Standards and Best Practice

Call-Off Contract for the Provision of Engineering Consultancy Services

CLIENT Dar Petroleum Operating Company
SCOPE OF WORK Study
PROJECT LOCATION Kurdistan, Iraq
DURATION 12 months
START DATE May-23
COMPLETION DATE Apr-24
PROJECT DESCRIPTION

The Services to be provided under the Contract may include, but not be limited to:

  • Feasibility studies and frontend engineering studies;
  • Detailed design activities, including preparation of procurement documentation (invitation to tender packages) and technical bid evaluations;
  • Provision of personnel to work within TAQA’s organization;

The provision of any other work and Services incidental to the foregoing including ‘as building’ documentation, survey works, minor plant changes, etc.

Project Management Site Services

CLIENT Dar Petroleum Operating Company
SCOPE OF WORK Study
PROJECT LOCATION Kurdistan, Iraq
DURATION 12 Months
START DATE Mar-23
COMPLETION DATE Feb-24
PROJECT DESCRIPTION

Contractor shall provide the required personnel, and personnel management to support TAQA’s project activities as required.

Detailed Design Study for Sour Gas Incinerator with WHRU

CLIENT Dar Petroleum Operating Company
SCOPE OF WORK Study
PROJECT LOCATION Kurdistan, Iraq
DURATION 5 months
START DATE Feb-23
COMPLETION DATE Jun-23
PROJECT DESCRIPTION

Install a MODIFICATION that includes a Sour Gas Incinerator with associated Waste Heat Recovery Unit (WHRU). This will reduce the visible flare by burning the Gas in the Incinerator. The high temperature exhaust gas from the Incinerator will pass through a WHRU, which shall be integrated into a New Hot Oil System, which is used for on-site process heating requirements.

Provision of Engineering and Design Services

CLIENT Dar Petroleum Operating Company
SCOPE OF WORK Study
PROJECT LOCATION Kurdistan, Iraq
DURATION 36 Months
START DATE Feb-23
COMPLETION DATE Jan-26
PROJECT DESCRIPTION

Concept, FEED and Detailed Engineering for Block 9 Field.

Provision of Engineering and Design Services

CLIENT Dar Petroleum Operating Company
SCOPE OF WORK Study
PROJECT LOCATION Kurdistan, Iraq
DURATION 36 Months
START DATE Feb-23
COMPLETION DATE Jan-26
PROJECT DESCRIPTION

Concept, FEED and Detailed Engineering for Block 8 Field.

Technical Service for Engineering Projects in MEDC

CLIENT Dar Petroleum Operating Company
SCOPE OF WORK Study
PROJECT LOCATION Middle East
DURATION 24 Months
START DATE Dec-22
COMPLETION DATE Nov-24
PROJECT DESCRIPTION

Provide required Technical Service to support COMPANY for carrying out design engineering, detailed engineering, technical support for procurement activities such as; Material Requisitions (MRs), Technical Bids Evaluations (TBEs) & Vendor Data Requirements (VDRs), as well as support for the project management, planning, control, cost control, document control, construction and commissioning Work, as required.

Provision of Engineering Services (BAESHIQA)

CLIENT Dar Petroleum Operating Company
SCOPE OF WORK Study
PROJECT LOCATION Kurdistan, Iraq
DURATION 24 Months
START DATE Oct-22
COMPLETION DATE Sep-24
PROJECT DESCRIPTION

Perform conceptual engineering (Identify, assess, select, define) options, preparation of conceptual reports, project controls, procurement support, detailed design including all analyses, preparation of operation, maintenance, commissioning, and start-up assistance to Company's Operations Group as required and for the provision of all records I documentation necessary for the complete performance of the Work. Responsible for all aspects of the Services, regarding Health, Safety, Security and Environmental (HSSE) performance, quality management, schedule, cost, and functionality.

Provision of Engineering for Pipeline River Crossing on Single Span Bridge Design

CLIENT Dar Petroleum Operating Company
SCOPE OF WORK Study
PROJECT LOCATION Kurdistan, Iraq
DURATION 90 Days
START DATE Oct-22
COMPLETION DATE Jan-23 (Extension)
PROJECT DESCRIPTION

This pipeline traverses over the Khabour River via an underwater crossing, at which the original design was to bury the pipeline below the riverbed. During recent inspections, it was found that the pipeline was exposed at the Tawke side of the river crossing, and approximately 15 to 20mlengthofthepipelinewas found to be unsupported.

Provision of Engineering Consultancy Services

CLIENT Dar Petroleum Operating Company
SCOPE OF WORK Study
PROJECT LOCATION Kurdistan, Iraq
DURATION 24 Months
START DATE Jul-22
COMPLETION DATE May-24
PROJECT DESCRIPTION Call-Out Contract for Provision of Engineering Consultancy Services to Garmian block located in the Kurdistan Autonomous Region, Republic of Iraq.