FEED Design of Fire Suppression System

CLIENT Kurdistan Pipeline Company Pte Ltd
SCOPE OF WORK Engineering
PROJECT LOCATION Kurdistan, Iraq
DURATION 32 Weeks
START DATE Feb-22
COMPLETION DATE Sep-22
PROJECT DESCRIPTION FEED for Fire Suppression System at three main stations of KPS1, KPS2 and RETM.

Engineering Study for Rectification of Electrical Defects at KPS0 Station

CLIENT Kurdistan Pipeline Company Pte Ltd
SCOPE OF WORK Engineering
PROJECT LOCATION Kurdistan, Iraq
DURATION 16 Weeks
START DATE Jan-22
COMPLETION DATE May-22
PROJECT DESCRIPTION Engineering study for rectifications works on defective electrical equipment, material, components and instruments. The works include investigation, engineering study, design and engineering documentation and drawings for the systems.

Engineering for Rectification of 36 Electrical Category 1 Defects

CLIENT Kurdistan Pipeline Company Pte Ltd
SCOPE OF WORK Engineering
PROJECT LOCATION Kurdistan Iraq
DURATION 4 Months
START DATE Dec-20
COMPLETION DATE Mar-21
PROJECT DESCRIPTION

To perform Engineering Design calculations for the repairs and rectification of 36 Electrical Category 1 Defects.

To produce Engineering Design calculations, Bill of Quantities, Specifications, Detailed Engineering Drawings for Defects located within Battery Limit of Stations and identify the gap between the design parameters against the operating requirements of the equipment / item / system.

The scope also includes conducting site survey, investigation and obtaining all historical as well as present operations data of the equipment / item / system.