Different Projects

Process and Piping review of Water bath heaters and Slug catcher design. Scope involved review of P&ID’s, Datasheets, and other design documentation to ensure the adequacy of the design and correctness of Material Take offs
Engineering works for Slug Cather and Fuel gas skid. Preparation of Nozzle Orientation, Piping Isometrics, Piping Supports design, cable routing for Electrical and instrumentation inside the skids.
Process review of Water bath heaters. P&ID’s, Datasheets and document review and verification of Water bath heaters and Material Take off review of the skids.

Takreer Refinery Shutdown jobs

Proposal support

Safety Study of Anokyi Mainline Compressor Station (AMCS) EPCC Project

To conduct the following study for the Anokyi Mainline Compressor Station (AMCS) EPCC Project of Meridian Logistic and Engineering (MLE) on behalf of Ghana National Gas Company
SIMOPS study;
HAZOP study;
LOPA study;
SIL study; and
QRA study.

PWI Pump Skid Stress Analysis

Provide pump package stress, structural stress and lifting analysis for PW Pump Skid.

DNO North Iraq Topping Facility

Safety Design Review – DNO North Iraq Topping Facility.

Provision of Engineering Services

To perform engineering, detailed design including all analyses, procurement personnel support, preparation of operation and maintenance manuals, Commissioning and Start–up assistance to Company’s Operations Group as required and for the provision of all records / documentation necessary for the complete performance of the Work.
Also responsible for all aspects of the Services, with regard to Health, Safety, Security and Environmental (HSSE) performance, quality management, schedule, cost, and functionality.

Provision of Engineering for Pipeline River Crossing on Single Span Bridge Design

This pipeline traverses over the Khabour River via an underwater crossing, at which the original design was to bury the pipeline below the riverbed. During recent inspections, it was found that the pipeline was exposed at the Tawke side of the river crossing, and approximately 15 to 20m length of the pipeline was found to be unsupported.

Peshkabir Gas Project

Engineering Support for the Peshkabir Gas Project to provide Pre-FEED team that shall perform engineering to enable a FEED contract to be awarded for the Peshkabir Gas Project Facilities at the Peshkabir, Tawke and Fishkhabour sites and provide all records / documentation necessary for the complete performance of this scope.

Peshkabir 2nd Stage Gas Capture / Tawke AGI Optimization Concept Techno-Economic Screening Study Proposal

To explore possible options and provide recommendation for the Peshkabir 2nd stage separator associated gas capture and enhance the gas handling compression and injection.

Provision of Third Party Technical Review for Paloch De-Bottlenecking (DBN) Facilities

Evaluate the Process Issues with the aim of de-bottlenecking the facility to achieve the original design intent. Conduct Site Visit and Sampling to inform de-bottlenecking recommendations. Adhere to DPOC Standards & Codes, South Sudan’s Rules, Regulations, and Laws, and International Standards and Best Practice