Provision of Engineering and Site support Service

CLIENT TAQA Atrush BV
SCOPE OF WORK PMC
PROJECT LOCATION Kurdistan, Iraq
DURATION 12 Months
START DATE Aug-21
COMPLETION DATE Aug-22
PROJECT DESCRIPTION To provide PMC Services to support TAQA’s operation in Atrush Block.

Framework Agreement for a Project Management Contract

CLIENT TAQA Atrush BV
SCOPE OF WORK PMC
PROJECT LOCATION Algeria
DURATION 60 months (Framework Agreement)
START DATE Nov-18
COMPLETION DATE Nov-23
PROJECT DESCRIPTION

A multi-year framework agreement for the performance of Project Management Contract "PMC" services for EPC Contracts.

Provision of Project Management Consultancy (PMC) for Sustained Production and Related Facilities

CLIENT TAQA Atrush BV
SCOPE OF WORK PMC
PROJECT LOCATION Iraq
DURATION 24 months
START DATE Aug-16
COMPLETION DATE Aug-18
PROJECT DESCRIPTION

Reservoir, Source Water Plant 1 (SWP1) Expansion and Water Supply Pipeline (WSP).

To sustain the production of CPF1 and CPF2 in 2016, tie-in of new wells and existing well including the related facilities located in well pads by gathering crude oil and gas from the oil wells, transport through flow lines and/or trunk lines to CPF1/CPF2 is required.

Oil and Gas Gathering System, Pilot Test of Gas Lifting, Gas Lifting System, Water Injection System, Water Supply, Drain and Fire Fighting System, Power Supply System, Improvement to the Gas Turbine Power Plant, Instrumentation and Control System, Telecommunication System, Civil Works, Roads etc.

Provision of Project Management Consultancy (PMC) Services for CPF3 and Associated Facilities

CLIENT TAQA Atrush BV
SCOPE OF WORK PMC
PROJECT LOCATION Iraq
DURATION 36 months
START DATE Apr-15
COMPLETION DATE Apr-18
PROJECT DESCRIPTION

Halfaya Oil Field CPF3 Expansion 200k BOPD to 400k BOPD.

Carry out the PMC for PetroChina Halfaya CPF3 Iraq:

  • Oil and Gas Train Units;
  • Gas Compression Systems;
  • Gathering Facilities (GRS); and
  • Roads, Camps, others.
  • Improvement to the Gas Turbine Power Plant
  • Completion and Commissioning of Gas Lift Compression Plant.
  • Provision of all site procedures, HSE, QA/QC, etc. and PMC Team for Project, Engineering & Construction Management of the Project Execution Phase.

Gas Processing Plant-Ghana

CLIENT TAQA Atrush BV
SCOPE OF WORK PMC
PROJECT LOCATION Ghana
DURATION 21 months
START DATE Mar-13
COMPLETION DATE Dec-14
PROJECT DESCRIPTION

PMC Service for Sinopec Ghana Gas Processing Plant:

  • 2x150MMscfd Gas Processing Plant (GPP);
  • Offshore Pipeline;
  • 40MW Gas Turbine Power Plant;
  • Roads, Camps, others.

ExidaSP has provided a team to the Detailed Engineering, Construction, Procurement and Commissioning phase 1 of the Project.

Provision of Project Management Consultancy (PMC) for Halfaya Oil Field Surface Facility Phase II

CLIENT TAQA Atrush BV
SCOPE OF WORK PMC
PROJECT LOCATION Iraq
DURATION 31 months
START DATE Sep-12
COMPLETION DATE Apr-15
PROJECT DESCRIPTION

Halfaya Oil Field Phase 2 Expansion

100k BOPD to 200k BOPD

Carry out the PMC for PetroChina Halfaya Phase 2-Iraq:

  • Oil and Gas Train Units;
  • Gas Compression Systems;
  • Lift Compression Systems
  • 150MMscfd Gas Receiving Station (GRS);
  • 3x10MW Gas Turbine Power Plant;
  • Roads, Camps, others.

Provision of all site procedures, HSE, QA/QC, etc. and PMC Team for Project, Engineering & Construction Management of the Project Execution Phase.