PROJECT DESCRIPTION |
Reservoir, Source Water Plant 1 (SWP1) Expansion and Water Supply Pipeline (WSP).
To sustain the production of CPF1 and CPF2 in 2016, tie-in of new wells and existing well including the related facilities located in well pads by gathering crude oil and gas from the oil wells, transport through flow lines and/or trunk lines to CPF1/CPF2 is required.
Oil and Gas Gathering System, Pilot Test of Gas Lifting, Gas Lifting System, Water Injection System, Water Supply, Drain and Fire Fighting System, Power Supply System, Improvement to the Gas Turbine Power Plant, Instrumentation and Control System, Telecommunication System, Civil Works, Roads etc. |