ExidaSP
  • Home
    • About Us
    • Corporate Governance
    • HSE Policy
    • Safety Achievement
    • Quality Vision
    • Scope of Work
    • Services & Expertise
    • Key Personnel
  • Engineering and Design Approach
  • Projects
    • Ongoing Projects
    • Completed Projects
  • Media
    • Press
    • Newsletters
  • Careers
    • Jobs List
    • Submit Resume
  • Contact us
  • Search
  • Menu Menu

Archive for: Study

You are here: Home1 / Scope of Work2 / Study

SIF Validation and Verification on Tilenga Project Upstream Facilities (TPUF)

Human Factors Engineering Study

Provision of Third Party Technical Review for Paloch De-Bottlenecking (DBN) Facilities

Fire Gas Detection – Layout Assessment

Peshkabir 2nd Stage Gas Capture / Tawke AGI Optimization Concept Techno-Economic Screening Study Proposal

Consultancy Services for Sarsang and Atrush Field Gas Processing Facility Study

Safety Study of Anokyi Mainline Compressor Station (AMCS) Phase II EPCC Project

Safety Study of Anokyi Mainline Compressor Station (AMCS) EPCC Project

Provision to Perform Plant Safe Operating Limits Gap Analysis and Produce the Latest Revision of Safe Operating Limit Documents

Provision to Perform Process Safety Information (PSI) Needs Analysis

Page 1 of 212

Pages

  • A-News
  • About us
  • About-us
  • Completed Projects
  • Contact us
  • Corporate Governance
  • Elements
  • Engineering and Design Approach
  • EXSPHome
  • Features
  • Headline Rotator
  • HSE Policy
  • Key Personnel
  • Ongoing Projects
  • Pages
  • Quality Vision
  • Safety Achievement
  • Scope of Work
  • Services & Expertise
  • Submit Resume
  • ThemeNcode PDF Viewer SC [Do not Delete]
  • Transparent Header
  • Vision, Mission & Core Values

Categories

  • News
  • Newsletter

Archive

  • April 2023
  • September 2021
  • November 2018
© Copyright - ExidaSP
Scroll to top