Different Projects

CLIENT OILSERV
SCOPE OF WORK Detailed Design
PROJECT LOCATION Kurdistan, Iraq
DURATION -
START DATE Dec-14
COMPLETION DATE Dec-22
PROJECT DESCRIPTION Engineering Support for different ongoing Projects and Proposals for DNO, HUNT OIL, TAQA, GAS PLUS, CHEVRON, PETRONAS, LUKOIL and EXXON.

Fire Gas Detection – Layout Assessment

CLIENT OILSERV
SCOPE OF WORK Detailed Design
PROJECT LOCATION Kurdistan, Iraq
DURATION 5 Weeks
START DATE Sept-22
COMPLETION DATE Dec-22 (Extension)
PROJECT DESCRIPTION

The scope of work for this project is limited to:
• Assess the robustness and reliability of the mitigation barrier associated with the existing point detector network for the detection/confirmation of a flammable and/or toxic gas release with the existing LOS detection system removed from the Safety Instrumented System (SIS);
• Study to evaluate whether the point detected currently provided is adequate. If inadequate, include a pragmatic recommendation to achieve the required barrier robustness.
• The study shall be limited to FZ-4 & FZ-9.
• The coverage of the detectors considered in the study is manufactured by M/S DECTON as indicated in section 3.2 Scope of Work document

Peshkabir 2nd Stage Gas Capture / Tawke AGI Optimization Concept Techno-Economic Screening Study Proposal

CLIENT OILSERV
SCOPE OF WORK Detailed Design
PROJECT LOCATION Kurdistan, Iraq
DURATION 7 Weeks
START DATE Feb-22
COMPLETION DATE Dec-22
PROJECT DESCRIPTION To explore possible options and provide recommendation for the Peshkabir 2nd stage separator associated gas capture and enhance the gas handling compression and injection.

FEED Design of Fire Suppression System

CLIENT OILSERV
SCOPE OF WORK Detailed Design
PROJECT LOCATION Kurdistan, Iraq
DURATION 32 Weeks
START DATE Feb-22
COMPLETION DATE Sep-22
PROJECT DESCRIPTION FEED for Fire Suppression System at three main stations of KPS1, KPS2 and RETM.

Engineering Study for Rectification of Electrical Defects at KPS0 Station

CLIENT OILSERV
SCOPE OF WORK Detailed Design
PROJECT LOCATION Kurdistan, Iraq
DURATION 16 Weeks
START DATE Jan-22
COMPLETION DATE May-22
PROJECT DESCRIPTION Engineering study for rectifications works on defective electrical equipment, material, components and instruments. The works include investigation, engineering study, design and engineering documentation and drawings for the systems.

Provision of Engineering and Site support Service

CLIENT OILSERV
SCOPE OF WORK Detailed Design
PROJECT LOCATION Kurdistan, Iraq
DURATION 12 Months
START DATE Aug-21
COMPLETION DATE Aug-22
PROJECT DESCRIPTION To provide PMC Services to support TAQA’s operation in Atrush Block.

Safety Study of Anokyi Mainline Compressor Station (AMCS) Phase II EPCC Project

CLIENT OILSERV
SCOPE OF WORK Detailed Design
PROJECT LOCATION Ghana
DURATION 6 Months
START DATE May-21
COMPLETION DATE Oct-21
PROJECT DESCRIPTION

To conduct the following study for the Anokyi Mainline Compressor Station (AMCS) Phase II EPCC Project of Meridian Logistic and Engineering (MLE) on behalf of Ghana National Gas Company:

  • SIMOPS study;
  • HAZOP study;
  • SIL (LOPA) study;
  • FERA; and
  • QRA study.

Engineering for Rectification of 36 Electrical Category 1 Defects

CLIENT OILSERV
SCOPE OF WORK Detailed Design
PROJECT LOCATION Kurdistan Iraq
DURATION 4 Months
START DATE Dec-20
COMPLETION DATE Mar-21
PROJECT DESCRIPTION

To perform Engineering Design calculations for the repairs and rectification of 36 Electrical Category 1 Defects.

To produce Engineering Design calculations, Bill of Quantities, Specifications, Detailed Engineering Drawings for Defects located within Battery Limit of Stations and identify the gap between the design parameters against the operating requirements of the equipment / item / system.

The scope also includes conducting site survey, investigation and obtaining all historical as well as present operations data of the equipment / item / system.

Provision of Design and Engineering Services for Firefighting System at CPF Sarqala-1 Wellsite, Garmian Block, Kurdistan

CLIENT OILSERV
SCOPE OF WORK Detailed Design
PROJECT LOCATION Kurdistan, Iraq
DURATION Approx. 18 Months
START DATE Oct-20
COMPLETION DATE Nov-21
PROJECT DESCRIPTION

Carry out all necessary Engineering works related to Fire-fighting system for CPF S-1 Facilities in accordance with NPFA standard. The firefighting equipment consist of Water Supply, Fire Water Tanks feeding the Fire Ring; Fire Pumps; Hydrants, Hydro-Foam Monitors, Post Indicator Valves; Deluge system at the new tanks; Sprinklers under the roof over loading bay and portable and wheeled fire extinguishers.

Provision of Leased Oil Train (LOT), Garraf, Iraq Provision of O&M Services (Garraf Project)

CLIENT OILSERV
SCOPE OF WORK Detailed Design
PROJECT LOCATION Iraq
DURATION 12 Months
START DATE Feb-20
COMPLETION DATE Jan-22
PROJECT DESCRIPTION To provide Operation & Maintenance (O&M) Services for Petronas Carigali Iraq Holding B.V. on behalf of Italfluid.