CLIENT | Kurdistan Pipeline Company Pte Ltd |
PROJECT TITLE | FEED Design of Fire Suppression System |
PROJECT DESCRIPTION | FEED for Fire Suppression System at three main stations of KPS1, KPS2 and RETM. |
SCOPE OF WORK | Engineering |
PROJECT LOCATION | Kurdistan, Iraq |
DURATION | 32 Weeks |
START DATE | Feb-22 |
COMPLETION DATE | Sep-22 |
CLIENT | Meridien Logistic and Engineering (MLE) For behalf of Ghana National Gas Company |
PROJECT TITLE | Safety Study of Anokyi Mainline Compressor Station (AMCS) Phase II EPCC Project |
PROJECT DESCRIPTION | To conduct the following study for the Anokyi Mainline Compressor Station (AMCS) Phase II EPCC Project of Meridian Logistic and Engineering (MLE) on behalf of Ghana National Gas Company: • SIMOPS study; • HAZOP study; • SIL (LOPA) study; • FERA; and • QRA study. |
SCOPE OF WORK | Study |
PROJECT LOCATION | Ghana |
DURATION | 6 Months |
START DATE | May-21 |
COMPLETION DATE | Oct-21 |
CLIENT | Kentz Overseas Company W.L.L. (A Member of SNC-Lavalin Group) |
PROJECT TITLE | Provision of Project Support Services for West Qurna 2 |
PROJECT DESCRIPTION | To provide manpower services for the Provision of Project Support Services for West Qurna 2 in the Republic of Iraq. |
SCOPE OF WORK | Engineering Manpower Supply |
PROJECT LOCATION | Iraq |
DURATION | 36 months [with one (1) year optional extension] |
START DATE | Sep-18 |
COMPLETION DATE | Sep-21 [with one (1) year optional extension] Cancelled |
CLIENT | Kurdistan Pipeline Company Pte Ltd |
PROJECT TITLE | Engineering for Rectification of 36 Electrical Category 1 Defects |
PROJECT DESCRIPTION | To perform Engineering Design calculations for the repairs and rectification of 36 Electrical Category 1 Defects To produce Engineering Design calculations, Bill of Quantities, Specifications, Detailed Engineering Drawings for Defects located within Battery Limit of Stations and identify the gap between the design parameters against the operating requirements of the equipment / item / system. The scope also includes conducting site survey, investigation and obtaining all historical as well as present operations data of the equipment / item / system. |
SCOPE OF WORK | Engineering |
PROJECT LOCATION | Kurdistan Iraq |
DURATION | 4 Months |
START DATE | Dec-20 |
COMPLETION DATE | Mar-21 |
CLIENT | DNO Iraq AS |
PROJECT TITLE | Provision of Engineering Services |
PROJECT DESCRIPTION | To perform engineering, detailed design including all analyses, procurement personnel support, preparation of operation and maintenance manuals, Commissioning and Start–up assistance to Company’s Operations Group as required and for the provision of all records / documentation necessary for the complete performance of the Work. Also responsible for all aspects of the Services, with regard to Health, Safety, Security and Environmental (HSSE) performance, quality management, schedule, cost and functionality. |
SCOPE OF WORK | Engineering |
PROJECT LOCATION | Kurdistan,Iraq |
DURATION | 24 Months |
START DATE | Feb-19 |
COMPLETION DATE | Feb-21 |
CLIENT | Gazprom Neft Middle East B.V. |
PROJECT TITLE | Supply and Delivery (Separate RFQs) |
PROJECT DESCRIPTION | Supply and Delivery of the following: 1) Multifunctional Electrical Meter 2) Mass Flow Meter 3) Universal Charging and Testing Unit FPU-1 (FPU-1-250-F-2.5-G3-A3-K) 4) Thermal Imager (FLK-TIS75 9HZ, Thermal Imager, Manual Focus) 5) Endress & Hauser Liquiphant FTL51 6) Honeywell Analytics Handheld Interrogator ATEX Certified (4V0 software) for Optima, Optima Plus and Excel. |
SCOPE OF WORK | Procurement |
PROJECT LOCATION | Kurdistan,Iraq |
DURATION | |
START DATE | Sep-16 |
COMPLETION DATE | Oct-20 |
CLIENT | Petronas Carigali Iraq Holding B.V. (PCIHBV) / Al-Tafaweq Co. (ATCO) |
PROJECT TITLE | Provision of Engineering, Fabrication, Installation, Execution and Commissioning of Well Tie-Ins and Other Construction Services for Petronas Carigali Iraq Holding B.V. Garraf Operations |
PROJECT DESCRIPTION | Detailed engineering and commissioning support for different well pads Tie-in. |
SCOPE OF WORK | Detailed Design |
PROJECT LOCATION | Iraq |
DURATION | 24 months [with one (1) year extension |
START DATE | Mar-17 |
COMPLETION DATE | Mar-19 [extend until Sept-20] |
CLIENT | Italfluid Geoenergy SRL |
PROJECT TITLE | HAZOP, IPF & HAZID Studies |
PROJECT DESCRIPTION | Provision of HAZOP, IPF & HAZID Studies for the Provision of Leased Oil Train Including Operations and Maintenance for Petronas Carigali Iraq Holding B.V (PCIHBV). |
SCOPE OF WORK | Safety Study |
PROJECT LOCATION | Iraq |
DURATION | 2-4 weeks |
START DATE | May-19 |
COMPLETION DATE | Jun-19 |
CLIENT | Italfluid Geoenergy SRL |
PROJECT TITLE | Provision of Leased Oil Train (LOT), Garraf, Iraq |
PROJECT DESCRIPTION | Engineering design works, including but not limited to the detailed Engineering design, record drawings and documentation. |
SCOPE OF WORK | Engineering |
PROJECT LOCATION | Iraq |
DURATION | 20 Months |
START DATE | Feb-19 |
COMPLETION DATE | Oct-20 |
CLIENT | SONANGOL PESQUISA E PRODUÇÃO IRAQ |
PROJECT TITLE | Provision of Engineering Services |
PROJECT DESCRIPTION | To provide engineering studies, cost estimation and engineering interpretation primarily but not solely aimed at identifying, evaluating and designing oil and gas surface facilities in Northern Iraq. |
SCOPE OF WORK | Engineering |
PROJECT LOCATION | Iraq |
DURATION | 24 months |
START DATE | Jan-19 |
COMPLETION DATE | Cancelled |
CLIENT | Encryo (Hong Kong) Co. Limited [For Meridien Logistic and Engineering (MLE) on behalf of Ghana National Gas Company] |
PROJECT TITLE | Safety Study of Anokyi Mainline Compressor Station (AMCS) EPCC Project |
PROJECT DESCRIPTION | To conduct the following study for the Anokyi Mainline Compressor Station (AMCS) EPCC Project of Meridian Logistic and Engineering (MLE) on behalf of Ghana National Gas Company • SIMOPS study; • HAZOP study; • LOPA study; • SIL study; and • QRA study. |
SCOPE OF WORK | Study |
PROJECT LOCATION | Ghana |
PROJECT VALUE (TIC)(US$) | TBA |
START DATE | Nov-18 |
COMPLETION DATE | May-19 |
CLIENT | Petronas Carigali Iraq Holding B.V. (PCIHBV) / Al-Tafaweq Co. (ATCO) |
PROJECT TITLE | Provision of Engineering, Procurement, Construction and Commissioning (EPCC) of Garraf Central Control Building (GCCB) |
PROJECT DESCRIPTION | Detailed engineering, architecture and commissioning support for the complete GCCB, including Architecture, civil/structure, Honeywell control systems, Telecommunication, phone/lan systems, and complete Electro/mechanical design. |
SCOPE OF WORK | Detailed Design |
PROJECT LOCATION | Iraq |
DURATION | 18 months |
START DATE | Sep-17 |
COMPLETION DATE | Mar-19 |
CLIENT | PETROCHINA/MOC |
PROJECT TITLE | Provision of Project Management Consultancy (PMC) for Sustained Production and Related Facilities |
PROJECT DESCRIPTION | Reservoir, Source Water Plant 1 (SWP1) Expansion and Water Supply Pipeline (WSP). To sustain the production of CPF1 and CPF2 in 2016, tie-in of new wells and existing well including the related facilities located in well pads by gathering crude oil and gas from the oil wells, transport through flow lines and/or trunk lines to CPF1/CPF2 is required. Oil and Gas Gathering System, Pilot Test of Gas Lifting, Gas Lifting System, Water Injection System, Water Supply, Drain and Fire Fighting System, Power Supply System, Improvement to the Gas Turbine Power Plant, Instrumentation and Control System, Telecommunication System, Civil Works, Roads etc. |
SCOPE OF WORK | PMC |
PROJECT LOCATION | Iraq |
DURATION | 24 months |
START DATE | Aug-16 |
COMPLETION DATE | Aug-18 |
CLIENT | PETROCHINA/MOC |
PROJECT TITLE | Provision of Project Management Consultancy (PMC) Services for CPF3 and Associated Facilities |
PROJECT DESCRIPTION | Halfaya Oil Field CPF3 Expansion 200k BOPD to 400k BOPD. Carry out the PMC for PetroChina Halfaya CPF3 Iraq: • Oil and Gas Train Units; • Gas Compression Systems; • Gathering Facilities (GRS); and • Roads, Camps, others. • Improvement to the Gas Turbine Power Plant • Completion and Commissioning of Gas Lift Compression Plant. Provision of all site procedures, HSE, QA/QC, etc. and PMC Team for Project, Engineering & Construction Management of the Project Execution Phase. |
SCOPE OF WORK | PMC |
PROJECT LOCATION | Iraq |
DURATION | 36 months |
START DATE | Apr-15 |
COMPLETION DATE | Apr-18 |
CLIENT | CPECC |
PROJECT TITLE | Rovuma LNG Project – Pioneer Camp & Optional Scopes |
PROJECT DESCRIPTION | Pre-Bid Engineering and Preparation of full Technical Proposal for the Provision of EPCC and O&M for Mozambique Rovuma Venture S.p.A (MRV) Pioneer Camp (150,000 m2) which includes offices, 500 bed accommodation, helipad and complete support facilities enable camp to be self-sufficient during operation. MRV may choose to expand the Pioneer Camp to 900–person (additional 400) and provide additional road infrastructure. |
SCOPE OF WORK | Pre-Bid Engineering |
PROJECT LOCATION | Mozambique |
DURATION | 3 months |
START DATE | Jul-18 |
COMPLETION DATE | Oct-18 |
CLIENT | DNO Iraq AS |
PROJECT TITLE | Peshkabir Gas Project |
PROJECT DESCRIPTION | Engineering Support for the Peshkabir Gas Project to provide Pre-FEED team that shall perform engineering to enable a FEED contract to be awarded for the Peshkabir Gas Project Facilities at the Peshkabir, Tawke and Fishkhabour sites and provide all records / documentation necessary for the complete performance of this scope. |
SCOPE OF WORK | Engineering Support |
PROJECT LOCATION | Kurdistan Iraq |
DURATION | 8 Weeks |
START DATE | Jun-18 |
COMPLETION DATE | Jul-18 |
CLIENT | Petronas Carigali Iraq Holding B.V. (PCIHBV) |
PROJECT TITLE | Provision to Perform Plant Safe Operating Limits Gap Analysis and Produce the Latest Revision of Safe Operating Limit Documents |
PROJECT DESCRIPTION | Perform the First Commercial Production (FCP) and Offsite Facility Safe Operating Limit (SOL) latest revision through the following process: a. Perform SOL Needs Assessment and Identify SOL Gap Analysis; b. Establish SOL Mapping Exercise; c. Prioritization of SOL documents and Gap Closure; d. Creating and Updating of SOL Documents to the latest revision. |
SCOPE OF WORK | Study |
PROJECT LOCATION | Iraq |
DURATION | 5 months |
START DATE | Jul-17 |
COMPLETION DATE | Dec-17 |
CLIENT | Petronas Carigali Iraq Holding B.V. (PCIHBV) |
PROJECT TITLE | Provision to Perform Process Safety Information (PSI) Needs Analysis |
PROJECT DESCRIPTION | To deliver the complete Process Safety Information (PSI) Needs Analysis Report including but not limited to: a) Process Safety Information (PSI) Needs Analysis Report; b) Presentation material outlining the salient point of the report; c) Native simulation files. |
SCOPE OF WORK | Study |
PROJECT LOCATION | Iraq |
DURATION | 4 months |
START DATE | Jan-17 |
COMPLETION DATE | May-17 |
CLIENT | TARGET ENGINEERING CONST. CO. (LLC) |
PROJECT TITLE | SIL Verification of Field Instruments – Paraffinic Naphtha Tanks Replacement (ADGAS) Project |
PROJECT DESCRIPTION | Assist ADGAS and Target Engineering Const. Co. (LLC) by performing SIL Verification for the Paraffinic Naphtha Tanks Replacement Project. |
SCOPE OF WORK | Study |
PROJECT LOCATION | UAE |
DURATION | 3 months |
START DATE | Jun-16 |
COMPLETION DATE | Sep-16 |
CLIENT | Fortune Engineering |
PROJECT TITLE | HAZOP Support for Avantgardre project |
PROJECT DESCRIPTION | Expert technical support for HAZOP review of FPSO Project skid packages. |
SCOPE OF WORK | Engineering Support |
PROJECT LOCATION | Nigeria |
DURATION | 1 month |
START DATE | Mar-16 |
COMPLETION DATE | Apr-16 |
CLIENT | SPEC-Hunt Oil |
PROJECT TITLE | Provision of Manpower Support |
PROJECT DESCRIPTION | Manpower Support to Hunt Oil Project in Kurdistan. The support includes O&M for 6 months. The job includes calibration of different types of field instruments. |
SCOPE OF WORK | Engineering Manpower Supply |
PROJECT LOCATION | Kurdistan, Iraq |
DURATION | 6 months |
START DATE | Feb-16 |
COMPLETION DATE | Aug-16 |
CLIENT | Fortune Engineering |
PROJECT TITLE | FPSO Project |
PROJECT DESCRIPTION | Calculation and design review of pumps in FPSO Skid. |
SCOPE OF WORK | Engineering Support |
PROJECT LOCATION | Nigeria |
DURATION | 1 month |
START DATE | Feb-16 |
COMPLETION DATE | Mar-16 |
CLIENT | CPECC BEB |
PROJECT TITLE | Different Projects |
PROJECT DESCRIPTION | Appointed by CPECC BEB to provide engineering support for their office in Dubai and provide engineers in different disciplines to support: • Algeria Projects Support. |
SCOPE OF WORK | Support for Detailed Design |
PROJECT LOCATION | Algeria |
DURATION | 24 months |
START DATE | Dec-15 |
COMPLETION DATE | Dec-17 |
CLIENT | Sudd Petroleum Company (SPOC)/ China Petroleum Engineering & Construction Corp. (CPECC) |
PROJECT TITLE | Block 5A Evacuation Pipeline from Thar Jath to Palouge |
PROJECT DESCRIPTION | HAZOP Study |
SCOPE OF WORK | Study |
PROJECT LOCATION | South Sudan |
DURATION | 1 month |
START DATE | Aug-15 |
COMPLETION DATE | Sep-15 |
CLIENT | Fortune Engineering |
PROJECT TITLE | Different Projects |
PROJECT DESCRIPTION | Process and Piping review of Water bath heaters and Slug catcher design. Scope involved review of P&IDs, Datasheets and other design documentation to ensure the adequacy of the design and correctness of Material Take offs Engineering works for Slug Cather and Fuel gas skid. Preparation of Nozzle Orientation, Piping Isometrics, Piping Supports design, cable routing for Electrical and instrumentation inside the skids. Process review of Water bath heaters. P&IDs, Datasheets and document review and verification of Water bath heaters and Material Take off review of the skids. |
SCOPE OF WORK | Engineering Support |
PROJECT LOCATION | Nigeria |
DURATION | 1 month |
START DATE | Jun-15 |
COMPLETION DATE | Jul-15 |
CLIENT | Fortune Engineering |
PROJECT TITLE | ADCO RMS stations upgrade Project |
PROJECT DESCRIPTION | Provided support for Mechanical handling study, RAM study, Datasheets and Specifications of Mechanical Equipment. |
SCOPE OF WORK | Engineering Support |
PROJECT LOCATION | Abu Dhabi, UAE |
DURATION | 1 month |
START DATE | Apr-15 |
COMPLETION DATE | May-15 |
CLIENT | Custom Process Equipment, LLC (CPE -LLC) |
PROJECT TITLE | Gas Treatment Plant at Khurmala Dome Field (EPC Phase) |
PROJECT DESCRIPTION | HAZOP Review |
SCOPE OF WORK | Engineering Support |
PROJECT LOCATION | Iraq |
DURATION | 1 month |
START DATE | Apr-15 |
COMPLETION DATE | May-15 |
CLIENT | Fortune Engineering |
PROJECT TITLE | Design-Review ADCO 51 OGD Wells and IA Compressor Upgrade |
PROJECT DESCRIPTION | Design review support |
SCOPE OF WORK | FEED |
PROJECT LOCATION | Abu Dhabi, UAE |
DURATION | 1 month |
START DATE | Feb-15 |
COMPLETION DATE | Mar-15 |
CLIENT | ESSJAY CONTRACTING |
PROJECT TITLE | Takreer Refinery Shutdown jobs |
PROJECT DESCRIPTION | Proposal support |
SCOPE OF WORK | Pre-Bid Engineering |
PROJECT LOCATION | Abu Dhabi, UAE |
DURATION | 1 month |
START DATE | Feb-15 |
COMPLETION DATE | Mar-15 |
CLIENT | CPECC |
PROJECT TITLE | Afungi Pioneer Camp EPC |
PROJECT DESCRIPTION | Proposal and pre-bid engineering |
SCOPE OF WORK | Pre-Bid Engineering |
PROJECT LOCATION | Mozambique |
DURATION | 3 months |
START DATE | Mar-15 |
COMPLETION DATE | Jun-15 |
CLIENT | PETROLINVEST |
PROJECT TITLE | High Priority Surveys for Common Seawater Supply Project (SOC) |
PROJECT DESCRIPTION | PMT Service for PetrolInvest High Priority Surveys for Common Seawater Supply Project (SOC) • Provided Project Management Services and related deliverables for High Priority Surveys which includes managing the subcontractors for Unexploded Ordnance (UXO) Survey, Topographical Survey, Geotechnical / Geophysical Survey, Bathymetric Survey, MetOcean Survey and Water Quality Sampling. • To manage contractual matters between Petrolinvest and subcontractors. |
SCOPE OF WORK | PMT |
PROJECT LOCATION | Iraq |
DURATION | 18 months |
START DATE | May-14 |
COMPLETION DATE | Nov-15 |
CLIENT | CPE- Al Noor |
PROJECT TITLE | FEED and Detailed Engineering |
PROJECT DESCRIPTION | Appointed by CPE to establish their Dubai office in accordance with Best International Practices. Worked with CPE Management to provide Corporate Procedures – HSE, QA/QC, Procurement, etc. to obtain ISO qualification for the Dubai Office. Provided Senior Engineer Teams for execution of Major Projects in Iraq: • Different projects for Petronas-Iraq; • Halfaya Works for PetroChina-Iraq. |
SCOPE OF WORK | PMT (FEED, Detailed Engineering) |
PROJECT LOCATION | Iraq |
DURATION | 14 months |
START DATE | Sep-13 |
COMPLETION DATE | Jan-15 |
CLIENT | CNPC/CPE |
PROJECT TITLE | Confidential |
PROJECT DESCRIPTION | Carry out the HAZOP, HAZID and SIL Study for Oil and Gas Facility. |
SCOPE OF WORK | Study |
PROJECT LOCATION | Confidential |
DURATION | 2 months |
START DATE | Jul-13 |
COMPLETION DATE | Sep-13 |
CLIENT | SINOPEC [SAF PETROLEUM INVESTMENTS (FZE)] |
PROJECT TITLE | Gas Processing Plant-Ghana |
PROJECT DESCRIPTION | PMC Service for Sinopec Ghana Gas Processing Plant: • 2x150MMscfd Gas Processing Plant (GPP); • Offshore Pipeline; • 40MW Gas Turbine Power Plant; • Roads, Camps, others. ExidaSP has provided a team to the Detailed Engineering, Construction, Procurement and Commissioning phase 1 of the Project. |
SCOPE OF WORK | PMC |
PROJECT LOCATION | Ghana |
DURATION | 21 months |
START DATE | Mar-13 |
COMPLETION DATE | Dec-14 |
CLIENT | CNPC/CPE |
PROJECT TITLE | Confidential |
PROJECT DESCRIPTION | Carry out the HAZOP, HAZID and SIL Study for Oil and Gas Facility. |
SCOPE OF WORK | Study |
PROJECT LOCATION | Confidential |
DURATION | 2 months |
START DATE | Feb-13 |
COMPLETION DATE | Apr-13 |
CLIENT | PETROCHINA / MOC |
PROJECT TITLE | Provision of Project Management Consultancy (PMC) for Halfaya Oil Field Surface Facility Phase II |
PROJECT DESCRIPTION | Halfaya Oil Field Phase 2 Expansion 100k BOPD to 200k BOPD Carry out the PMC for PetroChina Halfaya Phase 2-Iraq: • Oil and Gas Train Units; • Gas Compression Systems; • Lift Compression Systems • 150MMscfd Gas Receiving Station (GRS); • 3x10MW Gas Turbine Power Plant; • Roads, Camps, others. Provision of all site procedures, HSE, QA/QC, etc. and PMC Team for Project, Engineering & Construction Management of the Project Execution Phase. |
SCOPE OF WORK | PMC |
PROJECT LOCATION | Iraq |
DURATION | 31 months |
START DATE | Sep-12 |
COMPLETION DATE | Apr-15 |
CLIENT | PETROCHINA/ CNPC |
PROJECT TITLE | HAZOP and or HAZID and SIL Study |
PROJECT DESCRIPTION | Carry out the HAZOP and HAZID Study for Halfaya Phase 1 Oil and Gas Facility. |
SCOPE OF WORK | Study |
PROJECT LOCATION | Iraq |
DURATION | 1 month |
START DATE | Apr-12 |
COMPLETION DATE | May-12 |
CLIENT | DNO MIDDLE EAST (A BRANCH OFFICE OF DNO IRAQ AS) |
PROJECT TITLE | DNO North Iraq Topping Facility |
PROJECT DESCRIPTION | Safety Design Review – DNO North Iraq Topping Facility DNO North Iraq Topping Facility. |
SCOPE OF WORK | Design Review |
PROJECT LOCATION | Iraq |
DURATION | 1 month |
START DATE | Dec-08 |
COMPLETION DATE | Dec-08 |